Laserfiche WebLink
15 April 2004 <br /> AGE-NC Project No 99-0559 <br /> Page 13 of 13 <br /> Interim ground water remediation should proceed to minimize the migration of the free-product and <br /> significant concentration of MTBE Due to the high mobility of MTBE, pump-and-treat should be <br /> continued to capture ground water In the area of well MW-2 <br /> 7 0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an Independent laboratory Evaluations of the <br /> geologic/hydrogeologic conditions at the site for the purpose of this Investigation are made from a <br /> limited number of available data points(e g ground water samples), and subsurface conditions may <br /> vary away from these data points No other warranty, expressed or Implied, is made as to the <br /> professional interpretations, opinions and recommendations contained in this report <br /> Advanced CeoEnvironimntal,Inc <br />