My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012664
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2701
>
3500 - Local Oversight Program
>
PR0540315
>
ARCHIVED REPORTS_XR0012664
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 11:02:37 AM
Creation date
7/7/2020 10:57:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012664
RECORD_ID
PR0540315
PE
3526
FACILITY_ID
FA0023046
FACILITY_NAME
U-HAUL FACILITY NO 710050
STREET_NUMBER
2701
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95215
APN
11708014
CURRENT_STATUS
01
SITE_LOCATION
2701 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v'4 •4 _ � p <br /> and horizontal extent of soil contamination beneath the <br /> a former underground storage tank locations, and to determine <br /> " whether shallow <br /> ground water has been Impacted. This <br /> Workplan includes the drilling of approximately 3 to 6 soil <br /> borings, the installation of 4 monitoring wells, development, <br /> sampling and the calculation of groundwater gradient <br /> (Figure 2) , <br /> 3.0 SCOPE OF WORK <br /> The following scope of work has been developed to ' <br /> initiate the required soil and groundwater investigation: <br /> � aril' 3 to 6 soil borings...., g (number of borings is . <br /> dependent upon whether sub-surface contamination is <br /> encountered) ; <br /> i <br /> 2. Install four monitoring wells, placing one monitoring <br /> well near the center of the former tank locations, and <br /> three additional monitoring wells around the perimeter of <br /> the former tank locations; <br /> 3. Collect soil samples, each of them at five foot intervals <br /> during the drilling operation for lithvZogic determin- <br /> ation and laboratory analyses; <br /> 4• Have soil samples analyzed by a California Certified <br /> Laboratory for Total Petroleum Hydrocarbons <br /> (TPH-Gasoline) , Benzene, Toluene, Xylene, and Ethyl- <br /> benzene (BTXE) ; <br /> 5. Develop the monitoring wells and sample the ground <br /> _- -water--for-analysis-b a - -- - -- <br /> ^' y California Certified Laboratory. <br /> for Total Petroleum Hydrocarbons (TPH-Gasoline) , and <br /> ETS ENVIRONMENTAL & Assoe. <br /> ' " PROJECT NO. 305, PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.