My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2020 12:57:37 PM
Creation date
7/7/2020 1:48:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0232507
PE
2361
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
01
SITE_LOCATION
2500 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEI/ RP1200 - 12 <br /> G . If the spill bucket is found to have cracks , loose <br /> parts or separation of the bucket from the fill <br /> pipe, it is not considered to be liquid- tight This <br /> visually indicates a test failure . <br /> NOTE : If the fill cap is not included in the <br /> spill bucket test and/or the cap is not tight , it <br /> could be the source of potential fuel contami - <br /> nation from water intrusion . <br /> NOTE : Before permanently plugging , ensure <br /> that local regulations allow the drain valve to <br /> be permanently plugged . <br /> 6 . 2 . 5 Test Procedure . <br /> 110 Add water to the spill bucket to a level within <br /> 1 . 5 inches of the top of the spill bucket . Allow <br /> the water to settle for 5 minutes before the initial <br /> water level measurement is taken . <br /> 2 . Place the measuring stick vertically at the lowest <br /> point in the spill bucket and extending above the <br /> writer level to allow for an accurate measure- <br /> mem to he taken . The location of the measuring <br /> stick mist remain the same. for each water level <br /> measurement , DOClnilent the initial water level <br /> measurement as measured from the bottom of <br /> the spill bucket . Alternative measurement meth- <br /> ods may be used provided that measurement to <br /> 1 / I b ( 0 . 063 ) inch can be made. <br /> . Take all precautions to prevent the water level <br /> from beim= disturbed during the duration of the <br /> test . <br /> 4 . After I hour, document the ending water level <br /> measurcmcr� t , <br /> 5 . Upon completion of the test, remove and dis- <br /> pose of the water according to Section 6 . 7 , and <br /> dry the inside of the spill bucket before returning <br /> it to service. <br /> 6 . 2 . 6 Pass / Fail Criteria . If the water level has <br /> dropped less than 1 /8 (0 . 125 ) inch , the spill bucket <br /> passes the integrity test . <br /> If the water level has dropped 1 /8 ( 0 . 125 ) inch or <br /> greater, the spill bucket fails the integrity test . <br /> OD pei , org <br />
The URL can be used to link to this page
Your browser does not support the video tag.