Laserfiche WebLink
Blasg Environmental Management Inc 2nd Qtr 2004 Groundwater Momtonng Report <br /> 002-70950-04 U-Haul#709-50 <br /> 2003 and provided purified bulk water to the motel as a replacement Bulk water was provided until a <br /> SJCEHD approved well-head treatment system consisting of granular activated carbon (GAC) was <br /> installed at the site on June 4, 2003 The latest water samples from the domestic well (sampled prior to <br /> the well-head treatment system on May 7, 2004) indicated concentrations of 1,2 DCA were detected at <br /> lI 6 ppb The well-head treatment system will operate until the motel is connected to the city water <br /> system Construction on the required main line is expected to be installed by California Water Service <br /> by October 2004 <br /> i <br /> I <br /> I <br /> t i <br /> 1 <br /> 5 <br /> 1 <br />