Laserfiche WebLink
14 SCOPE OF WORK <br /> The quarterly monitoring program involved two separate monitoring events that occurred in December <br /> 2000 and March 2001 Both monitoring events involved the following tasks 1) collecting field <br /> measurements of groundwater conditions from all of the well casings in each of the well locations, 2) <br /> purging monitoring wells prior to collecting groundwater samples, 3) storing and profiling purged <br /> groundwater for disposal/treatment,4) analyzing groundwater samples, and 5)preparation of this report <br /> I15 PROJECT TEAM <br /> The project team consisted of Blaes Environmental of Phoenix, Arizona and Del Mar Analytical, Inc <br />' (Del Mar), a California State certified analytical laboratory located in Irvine, California Blaes <br /> Environmental coordinated and managed the project,performed field measurements, collected, sealed and <br /> arranged for proper transport of the groundwater samples to the analytical laboratory, and prepared this <br /> report Del Mar provided laboratory analysis of groundwater samples collected at the site <br /> 10 <br /> I <br /> I <br /> 1 <br /> 1 <br /> • 07/10/01 <br /> Blaes Project#002-70950-02 2 bjm C 1BLAES\U-Hau1170950170950r101 doe <br />