Laserfiche WebLink
1 <br /> _ Table 1. Potential Chemical Constituents of Concern At The Site <br /> fin^ mak. 4 $ <br /> 41 1 <br /> Benzene 3,000 ppm Colorless to Irritation to eyes Wash 924 <br /> light-yellow and nose,light- immediately <br />' liquid with an headed, and get <br /> aromatic odor staggered gait medical <br /> attention if <br />' ingested <br /> Toluene 2,000 ppm Colorless liquid Fatigue, Wash 882 <br />' with a sweet, dizziness,dilated immediately <br /> pungent, pupils, cough, and get <br /> benzene-like weak medical <br /> odor attention if <br /> ingested <br /> Ethylbenzene 2,000 ppm Colorless liquid Irritation to the Wash 8 '76 <br /> with an aromatic eyes,dizziness, immediately <br /> odor light-headed and get <br /> medical <br /> attention if <br /> ingested <br /> Xylenes(o,m,p) 1,000 pprn Colorless liquids Dizziness, Wash 856/856/ <br /> with an aromatic excitement, immediately 844 <br /> odor drowziness, and get <br /> staggered gait, medical <br /> irritation to nose attention if <br /> I and eyes, ingested <br /> vomiting, <br /> abdominal pain <br /> A review of the site structures and layout and a review of the site history indicates that the physical ha <br /> include overhead ower lines above P Y hazards at the site <br /> P ground structures, and underground utility lines <br /> I 2 0 PERSONNEL AND RESP <br /> ONSISILITIES <br /> The following personnel will be the key personnel in directing and conducting the health and safety program during <br /> the program at the site Each person's title and specific responsibilities are presented as follows <br /> 2 1 PROJECT MANAGER <br /> The Project Manager shall implement the requirements of this program for the drilling and soil sampling program at <br /> Ithe site Specifically,the Project Manager wiII have the following responsibilities <br /> Supervisory responsibility over all Blaes Environmental employees working on theproject, <br />