Laserfiche WebLink
Blues Environmental Management !ne U-Haul#709-50 <br /> 002-70950-04 Groundwater Momtonng Repvr[ <br /> 5130/03 <br /> • 1.0 INTRODUCTION <br /> j 1 This report presents a summary of activities and results of the groundwater monitoring program <br /> i <br /> conducted during the first quarter of 2003 (March 24 --27, 2003) at U-Haul Facility #709-50 located at <br /> 2701 North Wilson Way in Stockton, California The report presents a background of site conditions and <br /> ' a brief summary of the procedures and results for the most recentoundwater monitoring event <br /> � g <br /> 1 1 SITE LOCATION AND DESCRIPTION <br /> U-Haul Facility 709-50 is located at 2701 North Wilson Way, on the southwest corner of the intersection <br /> of North Wilson Way and Sanguineth Lane in Stockton, California (Figure 1) The site is situated in a <br /> ' commercial area and is currently used as an equipment storage and rental facility The site is generally <br /> flat with a slight grade to the southeast The site elevation is approximately 21 feet above mean sea <br /> level A general site plan is included as Figure 2 <br /> lie 1 2 PROJECT AUTHORIZATION <br /> In January 1999, Blacs Environmental Management, Inc (Blaes Environmental) was contracted by <br /> Amerco Real Estate Company/L]-Haul International (U-Haul) to conduct a soil and groundwater <br /> remediation program at the site The remediation program included developing a Remedial Action Plan <br /> I ' (RAP), conducting remedial testing, and performing quarterly groundwater monitoring and reporting <br /> Prior to initiating remedial activities at the site, the San Joaquin County Environmental Health <br /> ' Department (SJCEHD) requested several additional groundwater monitoring events and site <br /> characterization activities to confirm the concentration of petroleum hydrocarbons and to further <br /> evaluate the extent of the hydrocarbon plume in groundwater at the site <br /> ' 13 PROJECT STATUS <br /> In November 2001, Blaes Environmental submitted a work plan to the SJCEHD detailing proposed work <br /> for the site <br /> 1 <br /> 1 <br />