My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STOKES
>
1001
>
2200 - Hazardous Waste Program
>
PR0527027
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2020 3:16:03 PM
Creation date
7/8/2020 2:44:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0527027
PE
2226
FACILITY_ID
FA0018140
FACILITY_NAME
CHRISP COMPANY
STREET_NUMBER
1001
STREET_NAME
STOKES
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14328003
CURRENT_STATUS
01
SITE_LOCATION
1001 STOKES AVE
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
discharge more than 42 U . S . gallons of oil in each of two <br /> discharges as described in § 112 . 1 (b) within any twelve month <br /> period . ( § 112 . 9 (c) (5 )) <br /> All above ground valves and piping associated with transfer operations are � a ❑X <br /> inspected periodically and upon a regular schedule . The general condition of <br /> flange joints , valve glands and bodies, drip pans , pipe supports , pumping well <br /> polish rod stuffing boxes , bleeder and gauge valves , and other such items are <br /> included in the Inspection . ( See Inspection Log and Schedule) . <br /> ( § 11209 (d) ( 1 )) x' o <br /> An oil spill contingency plan and written commitment of resources are <br /> provided for flowlines and intra-facility gathering lines ( See Oil Spill <br /> Contingency Plan and Checklist) ( 112 . 9(d)(3 )) ; or <br /> r� y <br /> Appropriate secondary containment and/or diversionary structures or S �� <br /> equipment is provided for flowlines and intra-facility gathering lines to prevent <br /> a discharge to navigable waters or adjoining shorelines . The entire secondary <br /> containment system, including walls and floor, is capable of containing oil and <br /> is constructed so that any discharge from the pipe, will not escape the <br /> containment system before cleanup occurs . <br /> A flowline4ntra4acility gathering line maintenance program to prevent <br /> discharges from each flowline has been established at this facility . The <br /> maintenance program addresses each of the following : <br /> • Flowlines and intra-facility gathering lines and associated valves and ❑ ❑x <br /> equipment are compatible with the type of production fluids, their <br /> potential Corrosivity, volume, and pressure, and other conditional <br /> expected in the operational environment; <br /> • Flowlines, intra-facility gathering lines and associated appurtenances ❑ ❑X <br /> are visually inspected and/or tested on a periodic and regular schedule <br /> for leaks , oil discharges , corrosion, or other conditions that could lead <br /> to a discharge as described in § 112 . 1 (b) . The frequency and type <br /> of testing allows for the implementation of a contingency plan as <br /> described under part 109 of this chapter . <br /> • Corrective action and repairs to any flowlines and intra-facility ❑ 0 <br /> gathering lines and associated appurtenances as indicated by regularly <br /> scheduled visual inspections, tests , or evidence of a discharge . <br /> • Accumulations of oil discharges associated with flowlines, intra- ❑ ❑x <br /> facility gathering lines , and associated appurtenances are promptly <br /> removed . ( § 112 . 9 (d) (4)) <br /> The following is a description of the flowline/intra-facility gathering line ❑ ❑X <br /> maintenance program implemented at this facility : NONE <br /> Onshore Oil drilling and Workover Facilities (§ 112 . 10 (b) , (c) , and (d) : <br /> 1 ) The owner/operator must meet the general rule requirements as well as the requirements <br /> under this section. <br /> Table G42 General Rule Requirements for Onshore OilDrilling and Workover <br /> Facility <br /> Chrisp Company <br /> Prepared By William Buckman, Safety Director Page 20 of 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.