Laserfiche WebLink
General Requirements Apply N/A <br /> Mobile drilling or worker equipment is positioned or located to prevent ❑ ❑X <br /> discharge as describe in § 112 . 1 (b) . <br /> Catchment basins or diversion structures are provided to intercept and contain ❑ ❑X <br /> discharges of fuel, crude oil, or oily drilling fluids . ( § 112 . 10(c)) <br /> A blowout prevention (BOP) assembly and well control system was installed ❑ D <br /> before drilling blow any casing string or during workover operations . <br /> ( § 112 . 10 (d) <br /> The BOP assembly and well control system is capable of controlling any well- ❑ D <br /> head pressure that may be encountered while the BOP assembly and well <br /> control system are on the well . ( § 112 . 10 (d)) <br /> Chrisp Company <br /> Prepared By William Buckman, Safety Director Page 21 of 31 <br />