Laserfiche WebLink
`r .1 <br /> 4. Although you have not required it, I believe we are in concurrence that we should a 3empt <br /> to obtain a more complete lithologic profile than can be obtained by sampling at 5-foot <br /> intervals. Therefore, we are amending the scope of work to include continuous sampling of <br /> one boring (ED-2). This will be one of the deeper borings and will provide more <br /> information than a continuous core of a shallower boring. This amendment will also <br /> increase the cost of the investigation. <br /> If these revisions are acceptable, we will revise the cost estimate that we previously <br /> submitted to the Responsible Parties, so that once they have qualified for reimbursement <br /> from the Cleanup Fund, they will be able to submit the estimate and revised work phns for <br /> pre-approval. <br /> If you would like to discuss this site further,please call me at 772-3620. <br /> Sincerely, <br /> 64— <br /> Victor B. Cherven,Ph. D. <br /> Principal Geologist <br /> cc: Tom Nicolas <br /> Alfonso Ocampo <br /> Richard Oakden <br />