Laserfiche WebLink
26 August 2013 <br /> AGE Project No. 95-0130 <br /> Page 4 of 9 <br /> analysis of SVE influent TPH-g air stream concentrations versus time is included with <br /> Appendix B. The laboratory report (CTEL Project Nos. CT214-1304127, -1305157 and - <br /> 1306106) quality assurance and quality control (QA/QC) and chain of custody forms are <br /> presented in Appendix C. <br /> 2.3.3. Mass Calculation of Recovered Product <br /> The hydrocarbon mass removed during the SVE operating period was calculated using <br /> the equation: <br /> M = C•Q•t <br /> where: M = cumulative mass recovered (kg) <br /> C = vapor concentration (kg/M3) <br /> Q = extraction flow rate (M3/hr) <br /> t = operational period, in hours <br /> During the 2nd quarter 2013 (18 March to 17 June 2013), the SVE unit operated a total of <br /> 2,180 hours(i.e. approximately 91 days).The average analytical results of the influent SVE <br /> samples (Table 1), the average diluted SVE influent flow rates (Table 2) and the <br /> operational period (Table 3) were used to calculate the approximate mass of extracted <br /> gasoline during this period. <br /> During the 2nd quarter 2013 operational period, the total mass of hydrocarbons extracted <br /> by the SVE system was calculated to be approximately 175 pounds, or equivalent to a <br /> volume of approximately 28 gallons of gasoline. Based on the above mass and time <br /> period, total petroleum hydrocarbon (gasoline) SVE extraction rates were estimated to be <br /> between approximately 1 to 4 pounds/day. Added to the 24,488 pounds of petroleum <br /> hydrocarbons estimated to have been removed by SVE remediation since September2004 <br /> (start-up), the total mass of hydrocarbons extracted with SVE to date is estimated at <br /> 24,663 pounds (Table 3). <br /> 3.0. INTERIM GROUNDWATER EXTRACTION REMEDIATION <br /> Between 18 March and 17 June 2013, an interim GW ET remediation system was operated <br /> at the site. The groundwater treatment operation and maintenance procedures for the site <br /> were outlined in AGE's Interim Remediation Work Plan - May 2003, dated 21 May 2003. <br /> Advanced GeoEnvironmental,Inc. <br />