ENVIRONMENTAL HEALTH DEPARTMENT
<br /> SAN JOAQUIN COUNTY unitsnperrisms
<br /> Donna K.Heron,R.E.H.S. Carl Borgman,R.E.H.S.
<br /> Director 304 East Weber Avenue, Third Floor Mike Huggins,R.E.H.S.,R.D.I.
<br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Douglas W.Wilson,R.E.H.S.
<br /> • �.,, �P• Program Manager Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S.
<br /> 9 ci g b Laurie A.Cotulla,RE.H.S. Fax: (209) 464-0138 Robert Mc ,R. H.S.
<br /> Program Manager Mark Barcelllonellos,R.E.H.S.
<br /> KEN AND ED ENDICH APR 2 52002
<br /> TOP FILLING STATION
<br /> 1428 E MARKET STREET
<br /> STOCKTON CA 95205-5531
<br /> RE: 101 South Wilson Way SITE CODE: 1294
<br /> WORKPLAN: Feasibility Studies and Monitoring Well Installation Work Plan
<br /> DATED: March 11. 2002
<br /> PREPARED BY: Advanced GeoEnvironmental Inc.
<br /> APPROVED X—WITH COMMENTS
<br /> DISAPPROVED
<br /> ADDENDUM
<br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORKPLAN (H&S 25299.37,subd.(c)(3).):
<br /> 1. Installation of a 6-inch ground water extraction well(EW-1) screened between 35-55 ft bag.
<br /> 2. One 4-inch soil vapor extraction well(VW-4)and one in-situ air sparging well(AW-1),multi-level
<br /> wells,(MW-10,MW-12,and MW-13),to be screened 35115 ft bag(A),50-55 ft bag(B),70-75 ft
<br /> bsg(C), 100-110 ft bsg(D),and 125-142 ft bsg(E)and(MW-11)to be screened 35-45 ft bsg(A),
<br /> 50-55 ft bsg(B),70-75 ft bsg(C), 100-110 ft bsg(D),and 125-145 ft bsg(E).
<br /> 3. Performance of a 24-hour groundwater aquifer pumping test,an 8-hour soil vapor extraction test,
<br /> a 48-hour in-situ air sparge test,and an 8-hour soil vapor extraction/in-situ air sparge pilot test.
<br /> 4. Soil samples will be sent to the laboratory for analysis of TPH-g,BTEX,(MTBE),(TAME),
<br /> di-isopropyl ether(DIPE),ethyl tertiary-butyl ether(ETBE),tertiary butanol(TBA), 1,2-
<br /> dichloroethane(1,2-DCA),ethylene dibromide(EDB),and total lead.
<br /> COMMENTS AND CONDITIONS:
<br /> 1. EHD and CVRWQCB discussed the need to begin interim remediation to control the MTBE
<br /> plume. Begin immediately installing EW-1 and perform 24-hour groundwater extraction
<br /> feasibility test.
<br /> 2. The work plan proposes the installation of(MW—8 and MW-9)to be screened between 35-45 ft
<br /> bsg. EHD recommends installing multi-level wells for MW-8 and MW-9 to further delineate the
<br /> southwest and northwest extent of petroleum hydrocarbon-impacted ground water.
<br /> 3. EHD recommends taking IAS parameters of the observation points of wells MW-1,MW-2,
<br /> MW-3,MW-5,MW-8,VW-1,VW-2,VW-3 and EW-1 for an 8-hour period the day prior to
<br /> running the 48-hour in-situ air sparge test. The parameters should be the same as the actual IAS
<br /> pilot test defined in the work plan.
<br /> 4. EHD recommends that the location of the in-situ air sparge well(AW-1)be moved south west of
<br /> VW-I to the rear comer of the Top Filling building or west of VW-3 to increase the number of
<br /> down gradient observation points for this study.
<br />
|