Laserfiche WebLink
Top Filling Page 2 <br /> 101 South Wilson Way <br /> 5. Continuous core soil samples in the intervals of interest should be taken for MW 10 and MW 12 or <br /> MW 13 borings to verify lithology for final well-screen intervals. Soil samples will be collected <br /> every 5 feet from the other intervals and from all other borings. Soil samples will be analyzed for <br /> total petroleum hydrocarbons as gasoline(TPHg),benzene,toluene,ethylbenzene,total xylenes <br /> (BTEX),gasoline oxygenates, 1,2 dichlorethane(DCA),and ethylenedibromide(EDB). <br /> 6. Obtain a well permit from EHD as well as other applicable site assessment permits. <br /> 7. Prepare a report with the well installations,ground water aquifer pumping test,SVE pilot study, <br /> IAS test,and SVE/IAS pilot test results. <br /> REASONS FOR DISAPPROVAL OF THE WORKPLAN(H&S 25299.37,subd.(c)(3).): <br /> None <br /> DATED 4-17-2002 <br /> ebecca E. et ff, HS Nuel Henderson <br /> Site Mitigation UNIT IV Registered Geologist UNIT IV <br /> Cc: AGE—Tim Cuellar <br /> CVRWQCB—Marty Hartzell <br />