My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008429
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4344
>
2900 - Site Mitigation Program
>
PR0541976
>
ARCHIVED REPORTS_XR0008429
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 10:30:13 PM
Creation date
7/9/2020 9:39:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008429
RECORD_ID
PR0541976
PE
2960
FACILITY_ID
FA0024090
FACILITY_NAME
CHEVRON FACILITY #9-9840
STREET_NUMBER
4344
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
10102157
CURRENT_STATUS
01
SITE_LOCATION
4344 WATERLOO RD
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PACIFIC <br /> \%W> ENVIRONMENTAL <br /> GROUP, INC _ l <br /> AN®COMPANY P:1, 12 <br /> ":1G <br /> 55 <br /> June 5, 1998 <br /> Project 920-122 IA <br /> IMr Brett Hunter <br /> Chevron Products Company <br /> P O Box 6004 <br /> San Ramon, CA 94583-0904 <br /> Re Report of Underground Storage Tank Replacement Activities and Work <br /> for Additional Site Investigation Plan <br /> Chevron Service Station 9-9840 <br /> 4344 Waterloo Road <br /> Stockton, California <br /> Dear Mr Hunter <br /> This report, prepared by Pacific Environmental Group, Inc (PEG) on behalf of Chevron <br /> Products Company(Chevron), presents the results of underground storage tank <br /> +� replacement activities at the site referenced above (Figures 1 and 2) Also presented is a <br /> Work Plan for additional site investigation The removal activities were outlined in PEG's <br /> Work Plan for Underground Storage Tank Replacement, dated November <br /> work plan was approved by Mr Michael J Infurna Jr of the San Joaquin County Public <br /> Health Services-Environmental Health Division (SJCPHS-EHD) on February 5, 1998 <br /> Field and laboratory procedures are presented in Attachment A <br /> SITE BACKGROUND AND PREVIOUS INVESTIGATIONS <br /> The site is located at 4344 Waterloo Road near Highway 99 in Stockton, California USTs <br /> at the site are currently being upgraded to meet 1998 Federal and State UST guidelines <br /> The facility is being expanded to include a car wash and a convenience store during the <br /> upgrade No previous investigations have been conducted at the subject facility <br /> REMEDIAL ACTIVITIES <br /> 1 Remedial activities conducted at the subject facility included source removal of obviously <br /> impacted soil during UST removal and replacement, in accordance with the approved <br /> Work Plan UST vessels and ancillary piping were removed by Henderson Construction <br /> and transported by Ecology Control Industries, Inc (formerly Erickson, Inc ) to their <br /> disposal facility in Richmond, California for cleaning and destruction Approximately 725 <br /> cubic yards of hydrocarbon-impacted soil were removed from the UST excavations and <br /> transported to the BFI Landfill in Livermore, California for disposal Removed soil was <br /> i 315 Sunrvse Gold Circle Shite M • Rancho Cordova California 95742.6534 <br /> (916) 858-2350 FAX (916) 858-2355 <br />
The URL can be used to link to this page
Your browser does not support the video tag.