My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009055
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
223
>
3500 - Local Oversight Program
>
PR0545813
>
ARCHIVED REPORTS_XR0009055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2020 9:01:46 PM
Creation date
7/9/2020 1:23:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009055
RECORD_ID
PR0545813
PE
3528
FACILITY_ID
FA0000713
FACILITY_NAME
RIPONA MARKET
STREET_NUMBER
223
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26106014
CURRENT_STATUS
02
SITE_LOCATION
223 W WASHINGTON ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M.J. Kloberdanz & Associates <br /> Health & Safety Plan <br /> 10 HEALTH AND SAFETY PLAN <br /> M 1 Kloberdanz&Associates has adopted the following health and safety procedures for working with organic vapors <br /> and liquid contaminants encounterW during drilling and excavation of subsurfae.e soil The purpose of this program is <br /> to provide health and safetv precautions for the initial and Subsequent site visits until the nature and magnitude of the <br /> contaminants have been defined <br /> 1 1 Personnel Responsibilities <br /> All personnel assigned or involved with the remedial investigation or site clean ups will have an assigned <br /> responsibility The outlined responsibilities will establish standards for personnel protective wear, safety <br /> procedures and provide for emergency actions which could arse during project operations <br /> 12 Projea_t Manager(PM) <br /> The Project Manager directs all project operations Project Manager(PM), in cooperation with the Project <br /> Safety Officer(PSO),has the primary responsibility for ensuring that the safety plan is read,signed,and fully <br /> understood by all employees and outside persons allowed around or within designated working perimeters of <br /> the job bite <br /> In cooperation with the PSO, he is responsible for ensuring that at all times during project operations, all <br /> employees adhere strictly to the Health and Safety Plan <br /> 13 ProjeLt Safety Officer(PSO) <br /> The PSO shall direct and ensure that all employees comply with the.Health and Safety Plan The PSO has the <br /> primary responsibility for <br /> I Assuring that appropriate personnel protective, equipment is available and properly utilized by all <br /> on-site personnel <br /> 2 Assuring that personnel are aware of the provisions of this plan,are instrui,ted in the work practices <br /> necessary to ensure safety,and in planned procedures for dealing with emergencies <br /> 3 Assuring that personnel are aware of the potential hazards associated with site operations <br /> 4 Monitoring the safety perforinanc.e of all personnel to ensure that the required work practices are <br /> emploved <br /> 5 Correcting any work practices or conditions that may result in injury or exposure to hazardous <br /> substances <br /> 6 Preparing any aLcident/mc ident reports(see attached A"ident Report Form) <br /> 14 Project EmploNee <br /> Project Employe e.s involved in on-site investigations are responsible for <br /> 1 Taking all reasonable precautions to prevent injury to themselves and to their fellow employees <br /> 2 Implementing Health and Safety Program and reporting to the PSO for any action deviating from <br /> the anticipated conditions described in the Health and Safety Plan <br /> S1 5 Special instructions <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.