Laserfiche WebLink
It is the responsibility of the Project Manager and the Health and Safety Manager to review the available site <br /> information to deterinine,to what degree the Health and Safety Plan will be implemented Each site will be <br /> handled on a case-by-case basis <br /> 20 SAFETY EVIPLEMENTATION <br /> The provisions of the M J Kloberdanz&Associates Health and Safety Plan are mandatory for all personnel associated <br /> with the site:project and operations <br /> A complete background review and site visitation will be conducted in order to deter-mine whether specific <br /> amendments are,to be made to the Health and Safety Plan based on specific,characteristics which may exist on the lob <br /> site Any Suspected hazards associated with the on-site operation which exposure to, via inhalation or skin absorption, <br /> to such as suspected carcinogens or human stenlants,will be documented and specific guidance will be developed and <br /> added to this Health and Safety Plan as Appendices <br /> A defined project site layout is paramount to the safe completion of all remedial site investigations The project site <br /> layout has built-in safety features The site is divided into three zones The following list defines the required personnel <br /> protective equipment <br /> 21 Personnel Protective Equipment(PPE) <br /> Personnel who will be working in or around the exclusion zone of the job site will use the following <br /> protective equipment and measures as marrant by the Project Manager <br /> Coveralls as an undergarment <br /> - 5aranex outer garment <br /> Sample gloves(inner) <br /> PVC,Nitrile or Neoprene outer gloves <br /> - Hard hat <br /> - Steel toe boots <br /> - Robars or Tingley boots <br /> Full face-pine respirator with R53HE cartridges(a combination of organic vapor,acid gas,pesticide, <br /> radionuclide,high efficiency filter) Note that cartndges should be changed daily <br /> All joints to be taped <br /> - Self-contamcd air will be utilized if project dictates <br /> More stringent protective equipment requirements will be implemented if necessary This determination will <br /> be made by the project supervisor after review of the materials to be handled, tht. ambient monitoring data, <br /> consultation with on-site technical personnel, the Safety Officer, and the proper management personnel <br /> Upgrades in PPE,if necessary,will be implemented <br /> 22 General Safety <br /> The on-site Safety Officer will be responsible for the following daily safety implementations <br /> 23 Daily Satety Meetings <br /> Each dav, prior to Lomrnencnig work, a safety meeting shall be held to discuss safety considerations for the <br /> day's work to be done A safety topic shall be addressed each day from the following list <br /> - Site Safety Plan(first day and once a week thereafter) <br /> - Fire Fighting Techniques <br /> - Defensive Driving <br /> - Decontamination <br /> - Levels of Protection <br /> - Heat Stress <br /> - Emergency Equipment on Site <br /> - Confined Space Entry Procedure- Respirator Maintenance <br /> . - Self-contained Breatlung Apparatus Training(if necessary) <br /> 9 <br />