Laserfiche WebLink
w w <br /> 24 Safety Log <br /> A safety log shall be kept for the project work site <br /> 25 Eating,Drinking,Smoking <br /> Eating,drinking,and smoking shall be allowed only in the designated areas in the support zone No personnel <br /> may eat,thrill.,or smoke on site in any other area except as permitted by the SSO <br /> 26 Safety Plan Acknowledgment Sheet <br /> All personnel visiting or working at the site shall read and certify to reading this SSP by appropriately <br /> completing the Safety Plan Acknowledgment Sheet(Page 9)attached to this plan <br /> 30 EMERGENCY CONTINGENCY PLAN <br /> Should any situation or unplanned occurrence require outside or support services, the appropriate contacts from the <br /> following list should be made <br /> -Project Manager <br /> -Client Project Coordinator <br /> -Police/Shenffs Department <br /> -Ambulant t[ <br /> -Hospital <br /> 31 Emergency Conditions <br /> In the event an emergency develops on-site,the procedures delineated herein are to be immediately followed <br /> Emergency conditions are considered to exist if <br /> - Any member of the project is involved in air accident or experiences any adverse effects of <br /> symptoms of exposure while on site <br /> - A condition is discovered that suggests the c.xistenLe of a situation more hazardous than <br /> anticipated <br /> 32 Emergency Procedures <br /> In the event of an emergency, the following emergency procedures should be followed Personnel on site <br /> should use the "buddy" system (pairs) Buddies should prearrange hand signals or other mean of <br /> communication In emergencies the following hand signals are suggested <br /> - Hand gripping throat out of air,can't breathe <br /> Grip partner's wrist or place both hands around waist leave area immediately,no debate) <br /> Hands on top of head need assistance <br /> - rhumbs up OK,I'm all right,I understand <br /> Thumbs down No,negative <br /> Site work areas entrance and cXut routes will be planned and emergency escape routes delineated by the <br /> Project Manager These routes will be shown to all on-site personnel by the SSO <br /> Visual contact will be maintained between"pairs"on site with the team remaining in close proximity in order <br /> to assist each other in case of emergencies <br /> In the event that any member of the field crew experiences any adverse effects or symptom of exposure while <br /> on-site,the entire field crew should immediately halt work and act according to the instructions provided by <br /> the PSO <br /> . Wind indicators visible to all on-site personnel will be provided by the Project Manager to indicate possible <br /> routes for upwind escape <br /> 10 <br />