Laserfiche WebLink
Chronology <br /> 1340 W. Washington Street <br /> Pg. 2 <br /> 05/08/03 EHD staff met with consultant on- ite to finalize WP for additional soil . <br /> and groundwater sampling. <br /> 07/21/03 EHD performed on-site inspection during geoprobe soil and grgundwater <br /> sampling. <br /> 12/08/03 EHD reviewed the Additional Soil and Groundwater Investigation and <br /> Well Survey report prepared by B oher dated November 6, 2003 <br /> 02/24/04 EHD updated Case Closure Summ lry and site chronology and processed <br /> case for CVRWQCB concurrence. <br /> chron1340wash <br />