My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
4325
>
3500 - Local Oversight Program
>
PR0545834
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 3:00:59 PM
Creation date
7/15/2020 1:32:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545834
PE
3528
FACILITY_ID
FA0005104
FACILITY_NAME
ECONO GAS
STREET_NUMBER
4325
Direction
E
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15733708
CURRENT_STATUS
02
SITE_LOCATION
4325 E WASHINGTON ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kayo Status Report PLIgu 8 <br /> FEBRUARY 12, 1988 <br /> pending to confirm this suspicion . Additional field work may be <br /> necessary. <br /> Fast Gas <br /> 800 East Highway 1L2 <br /> Lodi , CA <br /> Env. Assessment Consultant : Du Pont <br /> A groundwater recovery/treatment system has been installed at <br /> this site since November 1985 . A groundwater recovery well has <br /> been operating--and• i-s-pu-lli�ng,.-t-h-e-c-6'n-tam°i-nated3 water -back--toward <br /> the well . The Dupont In Situ Biore�clamation group has prepared <br /> a draft plan for continued subsurface investigation and bio- <br /> remediation of the contamination . This plan was submitted to <br /> RWQCB, field work outl-ined in plan has been conducted, <br /> contamination extends beyond limits of drilling, further <br /> exploration required, property acce s in progress, permit appli- <br /> cation submitted . Vineyard too wet for drilling access . <br /> Periodic monitoring being conducted . Final report due early <br /> 1988 . <br /> Econo Gas Sta_t_ion <br /> 4325`East Was_h_ington <br /> Stockton, CA <br /> Env. Assessment Consultant : Du Pont j <br /> Phase II and III has been completed . Wells are being developed i <br /> and sampled . Extraction well for pump test will be installed <br /> January 21, 1988 . Pump test to be conducted early February. <br /> Groundwater sampling and analysis for Quarterly report . Draft <br /> PAR due March, 1988 . I <br /> Fast Gas <br /> 1919 West Clinton <br /> Fresno, CA <br /> Env. Assessment Consultant : Applied GeoSystems <br /> Remediation Consultant : Applied GeoSystems <br /> This property is leased by Kayo and will be returned to the <br /> property owner . It is my understanding that it will be leased <br /> to another party. <br /> i <br /> w <br />
The URL can be used to link to this page
Your browser does not support the video tag.