Laserfiche WebLink
Kayo Status Report PLIgu 8 <br /> FEBRUARY 12, 1988 <br /> pending to confirm this suspicion . Additional field work may be <br /> necessary. <br /> Fast Gas <br /> 800 East Highway 1L2 <br /> Lodi , CA <br /> Env. Assessment Consultant : Du Pont <br /> A groundwater recovery/treatment system has been installed at <br /> this site since November 1985 . A groundwater recovery well has <br /> been operating--and• i-s-pu-lli�ng,.-t-h-e-c-6'n-tam°i-nated3 water -back--toward <br /> the well . The Dupont In Situ Biore�clamation group has prepared <br /> a draft plan for continued subsurface investigation and bio- <br /> remediation of the contamination . This plan was submitted to <br /> RWQCB, field work outl-ined in plan has been conducted, <br /> contamination extends beyond limits of drilling, further <br /> exploration required, property acce s in progress, permit appli- <br /> cation submitted . Vineyard too wet for drilling access . <br /> Periodic monitoring being conducted . Final report due early <br /> 1988 . <br /> Econo Gas Sta_t_ion <br /> 4325`East Was_h_ington <br /> Stockton, CA <br /> Env. Assessment Consultant : Du Pont j <br /> Phase II and III has been completed . Wells are being developed i <br /> and sampled . Extraction well for pump test will be installed <br /> January 21, 1988 . Pump test to be conducted early February. <br /> Groundwater sampling and analysis for Quarterly report . Draft <br /> PAR due March, 1988 . I <br /> Fast Gas <br /> 1919 West Clinton <br /> Fresno, CA <br /> Env. Assessment Consultant : Applied GeoSystems <br /> Remediation Consultant : Applied GeoSystems <br /> This property is leased by Kayo and will be returned to the <br /> property owner . It is my understanding that it will be leased <br /> to another party. <br /> i <br /> w <br />