My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
4325
>
3500 - Local Oversight Program
>
PR0545834
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 3:00:59 PM
Creation date
7/15/2020 1:32:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545834
PE
3528
FACILITY_ID
FA0005104
FACILITY_NAME
ECONO GAS
STREET_NUMBER
4325
Direction
E
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15733708
CURRENT_STATUS
02
SITE_LOCATION
4325 E WASHINGTON ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F1,I3RUARx 12, 1.988 <br /> I c-ono Station <br /> 7601 Greenback Lane <br /> Citrus Heights, CA <br /> Env. Assessment Consultants : Ground ater Technology <br /> Remediation Consultant : Groundwater .Technology <br /> All field and analytical work outlined in the Preliminary Report <br /> was completed on schedule . The Problem Assessment Report is <br /> currently in draft form with the final being submitted before <br /> the end of January. Small amounts of gasoline continue to be <br /> —recovered from: MW-1-2-.= � -rTn-e-�-r-e-c•ow-ery system ---was down" f-or <br /> approximately 6 weeks to conduct major repairs to the recovery <br /> pump, associated piping, and electrical system, but is now <br /> operational . <br /> Fast Gas <br /> 6101 Watt Avenue <br /> North Highlands, CA <br /> Env. Assessment Consultant : Groundw ter Technology, Inc . <br /> Remediation Consultant : Groundwater Technology, Inc . <br /> The Final Remedial Plan of vapor extraction was submitted and <br /> approved by the Water Board . <br /> The permit for the authority to construct from t-he APCD - is <br /> currently pending . At this wri=ting, verbal approval was <br /> indicated and written was forthcoming . The most cost effective <br /> approach for operation of the system is a reduced amount of <br /> effluent to meet direct discharge limits . Vapor phase emission <br /> control will only be utilized if absolutely necessary. System <br /> start-up is planned for May, 1988 . <br /> Doug la.s-.Station: <br /> 900 South..Che.rokee ..Lane_ <br /> Lodi, CA <br /> Env. Assessment Consultant : Alpha Geotechnical Consultants <br /> Field work recently completed by Alpha Geotechnical, in the <br /> pursuit to characterize thissite, apparently indicates an <br /> expanded subsurface condition . An additional well was added to <br /> the field work in the downgradient direction to the perimeter of <br /> the site . Laboratory analyses of soil and water samples are <br />
The URL can be used to link to this page
Your browser does not support the video tag.