My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
4325
>
3500 - Local Oversight Program
>
PR0545834
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 3:00:59 PM
Creation date
7/15/2020 1:32:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545834
PE
3528
FACILITY_ID
FA0005104
FACILITY_NAME
ECONO GAS
STREET_NUMBER
4325
Direction
E
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15733708
CURRENT_STATUS
02
SITE_LOCATION
4325 E WASHINGTON ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kayo Status Report Page 8 <br /> October 30, 1987 <br /> The targeted wells were properly abandoned ;and replacedin: Junex�4F� <br /> 1987 according to the plan.. Sampling .f=om, the properly screened � s ' 'L, : <br /> wells in the lower', aquifer indicate -:thatF_ minor rt dissolved`;�� <br /> cpmponents : are present: This site is currently }oris arymonthly t� 4 ; <br /> monitoring status. °:through ;November, •A987, This effcrt. ::fisi „to z " j <br /> determine the trend or average.' level', of :;dissolved , 6o'n'' iltu`ent'sz <br /> in -'the groundwater Alpha:: Geotechnical!"is 'in-the :process p of s <br /> developing aPreliminary - Report-' with - a proposal to '-:define ful1 <br /> extent of contamination. <br /> Fast Gas <br /> 800 East Highway 12 <br /> Lodi, CA <br /> Env. Assessment Consultant: J .H. Kleinfelder and Assoc. <br /> Remediation Consultant : E. T . Dupont BioReclamation Group <br /> Several previous subsurface investigations have been conducted <br /> and have found soil and groundwater contamination. J.H. <br /> Kleinfelder has been contracted to review these existing data <br /> and conduct supplemental ' subsurface investigation work and <br /> - develop a comprehensive assessment report. .The supplemental <br /> onsite drilling has been completed and the final report is being <br /> prepared. The report is due by June 15, 1987. I <br /> A groundwater recovery/treatment system has been installed at <br /> this site since November 19.85. A groundwater recovery well has <br /> been operating and is pulling the contlaminated water back toward <br /> the well . The Dupont In Situ Bioreclamation group has prepared j <br /> a draft plan for continued subsurface investigation and bio- <br /> remediation of the contamination. , Tt ,is plan was submitted to <br /> RWQCB, field work outlined in- plan is scheduled to begin in late <br /> October . Final report due early 1988 . <br /> Econo.-Gas-Station <br /> 4_325 :East-Washing-ton . <br /> Env. Assessment Consultant : Applied GeoSystems <br /> Several. 'subsurface - -investigations have. been: ;conducted. -atthis j. <br /> station. Applied GeoSystems -- has . been$.:,.contracted-,to.: review,:the 3 <br /> x existing data and`: propose--additional assessments work. ` When :that <br /> pis : completed;' - -they :`will prepare "'a ;comprehens.ive <br /> " environmental-site-assessment report. . and will : Propose several <br /> e-Wr <br /> cleanup alternatives. Their proposal foz the supplemental <br /> Y i <br /> R: �f <br />
The URL can be used to link to this page
Your browser does not support the video tag.