Laserfiche WebLink
Kayo Status Report page g <br /> October 30, 1987 <br /> r <br /> assessment work was .submitted� and approved: ti • `,` ` 1 , <br /> 93 <br /> wy <br /> The underground' storage ,tanks _and pipfng�were` removedon`YJuy <br /> 1987`.: . :Tank ;backfill' :MA -Ia1 wasstockpUed f onN site <br /> presently <br /> wait-Int for the results of thesoil {�analyses;��to5, q <br /> y C t'SYW K <br /> determine if:` additional excavation' of .soil,;�isrnecessax <br /> LEI <br /> I <br /> Fast% Gas <br /> 1919 West Clinton <br /> Fresno, CA <br /> Env. Assessment Consultant: Applied GeoSystems „ l <br /> Remediation Consultant : Applied GeoSystems <br /> This property is leased by Kayo and will be returned to the , <br /> property owner. It is my understanding that it will be leased <br /> to another party. <br /> Applied GeoSystems has prepared a remediation plan for the site <br /> and has submitted it to Fresno County and the Fresno Branch, <br /> Central Valley Region, RWQCB. RWQCB requested several minor <br /> changes in Scope of Work. Plan resubmitted September, 1987, <br /> awaiting response . <br /> Fast Gas Station <br /> 1400 Yosemite Parkway <br /> Merced, CA <br /> I <br /> Remediation Consultant: Groundwater Technology, Inc.- <br /> This site is owned by Kayo but will be sold. 'Kayo will retain j <br /> the responsibility for cleaning up the existing contamination at <br /> the site . <br /> A groundwater recovery and treatment system was installed at <br /> this site in January 1986 . To date its operation has recovery <br /> more than 1600 gallons of gasoline . The contaminated water is <br /> treated with an air stripper and is discharged to the sanitary <br /> sewer . <br /> The .•ISB system is' completely installed and ... fully operational <br /> .~.with.-peroxide . being on =]rine .since September.,�_24.., 1987. Free'. <br /> product issstill�;.beinq recovered•, frarn 'the recover y : well-a..";sign ..alk <br /> 4the _-infiltration .-j,process T1s`'£ree ingp soil bound hydrocarbon'. <br /> A new air str3lpping.. tower will - be :installed by the ':end of,} : <br /> `October. r ' <br /> s <br /> -1X <br /> v,.r. .e, -_ -,.. n y t..,.� z,a-k'-. ,•s�li .-1S -!-.-- '^F.X-.. <br />