My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
4325
>
3500 - Local Oversight Program
>
PR0545834
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 3:00:59 PM
Creation date
7/15/2020 1:32:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545834
PE
3528
FACILITY_ID
FA0005104
FACILITY_NAME
ECONO GAS
STREET_NUMBER
4325
Direction
E
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15733708
CURRENT_STATUS
02
SITE_LOCATION
4325 E WASHINGTON ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ODI - <br /> , 800 East Highwax 12 <br /> A groundwater and gasoline recovery system has been in <br /> operation at the site since January 11986 . Recovery of free <br /> product has slowed and only small amounts are now found in <br /> the monitoring wells . Dupont/Conoco will be conducting an <br /> insitu bioreclamation ( ISH) feasibility study of the site in <br /> February and March. As soon as this is completed, a plan for <br /> ISB will be submitted for review. The ISB program will be <br /> designed to remediate the contaminated soil which continues <br /> to contribute contaminants to the groundwater . <br /> ,STOCKT0N= 32 S <br /> A Phase I site investigation has been conducted which <br /> indicated soil and water contamination. A Phase II <br /> Investigation plan will be prepared which will better define <br /> the extent of the contamination and provide additional <br /> information for a remediation plan. The proposal for Phase <br /> II will be submitted for review as soon as possible . <br /> MERCED - 1400 Yosemite Boulvard <br /> A groundwater remediation system, consisting of groundwater <br /> recovery and air stripping, has been in place and operating <br /> since January of 1986 . To date, approximately 1, 800 gallons <br /> of gasoline have been recovered and only small amounts of <br /> free product are now being found in the monitoring wells . An <br /> insitu bioreclamation ( ISH) feasibility study will be <br /> conducted in February and March. When this is completed, an <br /> ISB plan will be prepared and submitted for review. <br /> gACRAMENTO --- 2429 Fifth <br /> Phase I site investigation included the installation of 4 <br /> monitoring wells and showed groundwater contamination . The <br /> Phase II investigation was implemented in December 1986 and <br /> included the installation of 4 soil borings/monitoring wells . <br /> one additional well will be drilled offsite on city right-of- <br /> way as soon as approval is given by the city. The final <br /> environmental assessment report is delayed pending the <br /> installation of the offsite well . <br /> SACRAMENTO - 7282 Franklin Boulevard <br /> The Phase I site assessment was conducted in June and July <br /> 1986 . The results of this assessment have been submitted to <br /> the Central Valley RWQCB and Sacramento County for review. <br /> Additional site assessment work or the development of a <br /> remediation plan is on hold until the RWQCB completes their <br /> review of the assessment report. Bath soil and water <br /> contamination are present at the site . <br />
The URL can be used to link to this page
Your browser does not support the video tag.