My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
4325
>
3500 - Local Oversight Program
>
PR0545834
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 3:00:59 PM
Creation date
7/15/2020 1:32:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545834
PE
3528
FACILITY_ID
FA0005104
FACILITY_NAME
ECONO GAS
STREET_NUMBER
4325
Direction
E
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15733708
CURRENT_STATUS
02
SITE_LOCATION
4325 E WASHINGTON ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Kayo Status Report Page 7 <br /> July 22, 1987 <br /> verbal approval for the permits to operate the system have been <br /> given and Applied GeoSystems is in the process of acquiring the <br /> written permits . It is hoped that remediation will start by <br /> June 1, 1987 . <br /> As of July 21, 1987, the necessary permits still have not been <br /> Issued . This is delaying the initiation of remediation <br /> activities . <br /> Fast Gas <br /> 153 East Eleventh Street <br /> Tracy, CA <br /> Env. Assessment Consultants : Phase I - Dames and Moore <br /> Phase II - Groundwater Technology <br /> Remediation Consultant : Groundwater Technology <br /> The underground tanks were removed on October 30, 1986 . <br /> Contaminated Soil in the tank backfill and beneath the tanks was <br /> removed . Dames and Moore installed three monitoring wells on <br /> December 12, 1986 . Subsequent water sampling showed minor <br /> contamination ranging from 200 to 400 ppb benzene . The report <br /> for Phase I investigation was submitted on February 3, 1987 . <br /> Groundwater Technology, Inc. has conducted Phase II of the <br /> subsurface investigation. This. work consisted of installing <br /> five monitoring - wel-1s near the boundary of the property and <br /> offsite near the northeast corner of the property. The report <br /> with recommendations was received on June 10, 1987 and was <br /> submitted on June 12, 1987 . <br /> Groundwater Technology recommended that an additional off site <br /> monitoring well be installed across Eleventh Street and up- <br /> gradient from the Kayo site . This well was installed on July 9, <br /> 1987 . Significant contamination was found . We are currently <br /> waiting for the report discussing this -work . <br /> Econo Station <br /> 7601 Greenback Lane <br /> Citrus Heights, CA <br /> Env. Assessment Consultants : Phase I - LBME <br /> Phase II - Groundwater Technology <br /> Remediation Consultant : Groundwater Technology <br /> This station is closed and will not be reopened by Kayo. Kayo <br />
The URL can be used to link to this page
Your browser does not support the video tag.