Laserfiche WebLink
S <br /> e _ <br /> Kayo Status Report Page 8 <br /> July 22, 1987 <br /> proposes to sell this station . The underground tanks have been <br /> removed and the tank pit backfilled with clean pea-gravel . <br /> A groundwater recovery well and groundwater treatment system has <br /> been installed . The system has been operating since April 20, <br /> 1987 . The pumping rate is set very low (approximately 300 <br /> gallons per day) in order to meet the air emissions limit . The <br /> aquifer is very low yielding, however, and a higher pumping rate <br /> would probably not be appropriate . Air stripper influent and <br /> effluent monitoring is being conducted twice each month as <br /> required by the Sacramento County Air Pollution Control <br /> District.. Reporting is on a quarterly basis . <br /> Groundwater Technology, Inc. has been contracted to conduct a 1 <br /> pump test and assess the effectiveness of the recovery system { <br /> and air stripper . The pump test was conducted on April 20 and <br /> 22 . They will make recommendations for system improvement after 1. <br /> they complete their testing. <br /> Fast Gas <br /> 6101 Watt Avenue <br /> North Highlands, CA <br /> i <br /> Env. Assessment Consultant : Beta Associates <br /> Remediation Consultant : Groundwater Technology, Inc. <br /> I <br /> This station -is closed and wi-11 not be reopened by-- Kayo: -Kayo <br /> leases this property and plans to return the property to the <br /> owner . <br /> The subsurface site investigation work has found only soil <br /> contamination at this site . The groundwater is normally at 100 <br /> feet below ground surface in this area . <br /> Groundwater Technology, Inc. has been contracted to prepare a <br /> remediation plan employing soil veniting. Their proposal was <br /> submitted on May 27, 1987 . The initial soil venting tests were <br /> conducted on July 8, 1987 . They indicated that soil venting <br /> will be an effective way of remediating the contaminated soil . <br /> Kayo is presently waiting for Groundwater Technology' s proposal <br /> for full scale implementation of the ;plan. <br /> Douglas Station <br /> 900 South Cherokee Lane ! <br /> Lodi , CA <br /> Env. Assessment Consultant : GMS and Associates <br /> i <br />