My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008759
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
4325
>
3500 - Local Oversight Program
>
PR0545834
>
ARCHIVED REPORTS_XR0008759
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 2:55:29 PM
Creation date
7/15/2020 1:51:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008759
RECORD_ID
PR0545834
PE
3528
FACILITY_ID
FA0005104
FACILITY_NAME
ECONO GAS
STREET_NUMBER
4325
Direction
E
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15733708
CURRENT_STATUS
02
SITE_LOCATION
4325 E WASHINGTON ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> engineering and Conotructlon, Inc.. <br /> July 9, 1993 <br />' Job No 93036 <br />' Conoco, Inc <br />' Room PO - 3038 <br /> P O Box 4784 <br /> Houston, TX 77210-4784 <br />' ATTENTION Ms Linda Thompson <br /> Protect Coordinator - Remediation Technology <br />' SUBJECT Quarterly System Monitoring Report <br /> April - June 1993 <br />' Former Econo Gas Station <br /> Stockton, California <br /> Dear Ms Thompson <br /> This report presents the status of the soil remediation system located at Conoco Inc, 's (Conoco) former <br />' Econo Gas station, 4325 East Washington Street, Stockton, California between April 1, 1993 and June <br /> 30, 1993 This report represents a transfer in responsibility of environmental consultants Sunnver <br /> Engineering & Construction (Sunriver) is Conoco's new consultant as DuPont Environmental <br />' Remediation Services (DERS) has announced the closure of their California office <br /> A Sunrrver or DERS technician visited the site on a weekly basis Typical activities that were performed <br />' during a visit included equipment inspection, instrument calibration, influent and effluent soil vent gas <br /> concentration measurements, and control system adjustments A hand-held flame ionization detector <br /> (FID) was used by the technician to measure the vent gas hydrocarbon concentrations Monthly influent <br />' soil vent gas samples were collected for laboratory analyses A site visit sign-in log was maintained <br /> Laboratory results and chain-of-custody forms are attached in Appendix A <br />' The soil remediation system consists of a series of vapor wells, a vacuum blower, and a thermal <br /> incinerator The removal rate of the soil remediation system is approximately 105 standard cubic feet <br />' per minute The operating efficiency (actual operating time versus the total time in the reporting period) <br /> of the system was 88 percent <br />' 93035qua rep <br />' 4501-D O'Hara Avenue, Brentwood, California 94513 ■ (510) 516-0162 ■ FAX (510) 516-26+9 ■ Contractor's License #620479 <br />
The URL can be used to link to this page
Your browser does not support the video tag.