My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008759
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
4325
>
3500 - Local Oversight Program
>
PR0545834
>
ARCHIVED REPORTS_XR0008759
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 2:55:29 PM
Creation date
7/15/2020 1:51:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008759
RECORD_ID
PR0545834
PE
3528
FACILITY_ID
FA0005104
FACILITY_NAME
ECONO GAS
STREET_NUMBER
4325
Direction
E
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15733708
CURRENT_STATUS
02
SITE_LOCATION
4325 E WASHINGTON ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 9, 1993 <br />' Job No 93036 <br /> Page 2 <br /> Based on soil vapor concentrations presented in Table A, approximately 2,090 pounds (339 gallons) of <br />' gasoline were removed during this reporting period The remediation system has been operating since <br /> August 1989, and since then, approximately 95,103 pounds (15,439 gallons) of gasoline have been <br /> removed and treated Attached are two figures which show the mass of gasoline removed per month <br />' (Figure 1) and the cumulative mass of gasoline removed (Figure 2) Note that these two figures are from <br /> the fust quarter of 1993 The computer files necessary to generate the figures were not transferred by <br /> the previous consultant Sunriver will generate the necessary files to update the figures for the third <br />' quarterly report of 1993 <br /> Sincerely, <br /> SUNRIVER ENGINEERING & CONSTRUCTION, INC <br /> Michael Reese Lenard D Long <br />' Project Engineer Project Manager <br />' LDL/MR sp <br /> Attachments Table A - Summary of Soil Vapor Laboratory Results <br /> Figure 1 - Gasoline Removed Per Month <br /> Figure 2 - Cumulative Gasoline Removed <br /> Appendix A - Laboratory Results and Chain-of-Custody Forms <br /> 1 <br /> 1 <br /> 9303(Nua rep <br /> • Engineering and Construction, Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.