Laserfiche WebLink
TABLE 1 <br /> Monitoring Well and Remediation Well Construction Details <br /> Former EZ Serve 100966 <br /> 2537 Waterloo Road, Stockton, CA <br /> Well Number Well Location Abandonment Method Total Screen Interval Construction Well Boring <br /> Depth (Ft) Date Diameter Diameter <br /> MW-1 Onsite Overdill/Pressure Grout 90 70-90 6/12/92 4" 10 <br /> MW-2 Onsite Overdill/Pressure Grout 90 70-90 7/14/92 4" 10 <br /> MW-3 Onsite Overdill/Pressure Grout 91 71-91 7/15/92 4" 10 <br /> MW-4 Onsite Pressure Grout only 90 70-90 7/9/92 4" 10 <br /> MW-5 Onsite Pressure Grout only 90 70-90 7/10/92 4" 10 <br /> MW-6 Offsite Pressure Grout only 90 70-90 12/3/93 2" 8 <br /> MW-7 Onsite Pressure Grout only 90 70-90 12/3/93 2" 8 <br /> MW-8 Offsite Pressure Grout only 90 70-90 12/3/93 2" 8 <br /> MW-9 Onsite Overdill/Pressure Grout 65 40-65 6/4/01 2" 8 <br /> MW-10 Onsite Overdill/Pressure Grout 65 40-65 6/4/01 2" 8 <br /> MW-11 Onsite Overdill/Pressure Grout 65 40-65 6/4/01 2" 8 <br /> MW-12 Onsite Overdill/Pressure Grout 65 40-65 6/4/01 2" 8 <br /> MW-13 Offsite Pressure Grout only 65 40-65 12/11/02 2" 8 <br /> MW-14 Onsite Pressure Grout only 65 40-65 12/13/02 2" 8 <br /> MW-15 Offsite Pressure Grout only 65 40-65 12/16/02 2" 8 <br /> MW-16 Offsite Pressure Grout only 65 40-65 12/20/02 2" 8 <br /> MW-17 Offsite Pressure Grout only 65 40-65 12/16/02 2" 8 <br /> MW-18 Offsite Pressure Grout only 65 45-65 12/30/05 2" 8 <br /> MW-18D Offsite Pressure Grout only 90 70-90 12/30/05 2" 8 <br /> MW-19 Offsite Pressure Grout only 65.5 40.5-65.5 10/21/08 2" 8 <br /> MW-20 Offsite Pressure Grout onl 65 40-65 10/20/08 2" 8 <br /> MW-21 Offsite Pressure Grout only 90 80-90 10/22/08 2" 8 <br /> VW-1 SVE-2 Onsite OverdilUPressure Grout 65 55-65 1/3/95 2" 8 <br /> VW-2 SVE-3 Onsite OverdilUPressure Grout 65.5 55-65 1/3/95 2" 8 <br /> VW-3 AS-1/SVE-1 Onsite OverdilUPressure Grout 90 69-79/87.5-89.5 12/30/94 2" 8 <br /> EX-1 Onsite Pressure Grout only 70 40-70 12/9/02 6" 12 <br /> YEAS-1 Onsite OverdilUPressure Grout 65 15-50/63-65 12/10/02 4"/2" 10 <br /> VEAS-2 Onsite OverdilUPressure Grout 65 15-50/63-65 12/11/02 4"/2" 10 <br /> VEAS-3 Onsite Overdill/Pressure Grout 65 15-50/63-65 12/11/02 4"/2-1 10 <br /> YEAS-4 I Onsite Overdill/Pressure Grout 70 46-61 /67-69 10/24/08 4"/2" 12 <br /> YEAS-5 I Onsite Overdill/Pressure Grout 70.5 46-61 /68.5-70.5 10/22/08 411/2" 1 12 <br />