Laserfiche WebLink
We//Rborrdoninent Reporr <br /> April 23,2012 Former EZ Serve 100966 <br /> 2537 Waterloo Road.Ssocictan, CA <br /> way into the sand pack pore space.The actual volume of grout placed in each well exceeded the <br /> calculated volume(see Table). After pressure grouting,the top three feet of casing was drilled <br /> out and more Portland cement was added to the top of the remaining casing, and allowed to flow <br /> over the edge of the remaining casing to about six inches above the top of the casing. Well <br /> boxes were then removed and replaced with like-material to match the surrounding area. <br /> On April 166, 17`h and 18`h,2012,the remaining wells MW-1,-2, -3,-9, -10, -11, -12; VW-1 <br /> (SVE-2), VW-2(SVE-3), VW-3(AS-I/SVE-1),and VEAS-I,-2,-3,-4, -5 were abandoned by <br /> drilling to the total depth of the well with the same diameter auger as each well was installed, <br /> and then grouted with neat cement from the bottom of the boring to the surface(see Table). The <br /> well boxes were then removed and replaced with like-material to match the surrounding area. <br /> EX-1 was not drilled out because it had a stainless steel casing. This well was pressure grouted <br /> on April 18,2012. The top three feet of the casing was removed and more Portland cement was <br /> added to the top of the remaining casing,and allowed to flow over the edge of the remaining <br /> casing to about six inches above the top of the casing. <br /> Soil cuttings were taken to Sacramento County Landfill . Decon water was taken to Inviro-tec <br /> Disposal in Lincoln,CA. Analytical results and receipts for disposal are included in Enclosure <br /> B. <br /> Sincerely, <br /> DOULOS ENVIRONMENTAL,INC. <br /> Hal Hansen, P.G.#6697,C-57#730042 <br /> HEH/sja <br /> Attachments: <br /> Enclosure A: San Joaquin County permits <br /> Enclosure B: Analytical Results for Soil Disposal and Soil Disposal Receipts <br /> Cost Effective Solutions <br />