My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012653
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2537
>
3500 - Local Oversight Program
>
PR0545857
>
ARCHIVED REPORTS_XR0012653
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2020 10:21:20 PM
Creation date
7/15/2020 2:47:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012653
RECORD_ID
PR0545857
PE
3528
FACILITY_ID
FA0005147
FACILITY_NAME
E-Z FOOD
STREET_NUMBER
2537
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
11914035
CURRENT_STATUS
02
SITE_LOCATION
2537 WATERLOO RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The annular space between the well casing and the borehole will be filled with a sari <br /> pack as described to a point approximately 1 foot above the top perforation in the scree <br /> followed by a 3 foot bentonite clay plug. The remaining annular space will then b <br /> backfilled with neat cement to a few inches below grade. <br /> A cast-aluminum utility box with water-tight seal find PVC apron will be placed over eac <br /> well head and set in concrete, flush with the surrounding grade. <br /> *MONITORING WELL SAMPLING <br /> The wells will be developed before water sampling by surge pumping or othc <br /> suitable method. During well development, discharge water will be monitored visually fc <br /> turbidity. Well development will continue until the discharge water is clear of silt and san <br /> and PH conductivity and temperature of the water has stabilized. Presence of formatior <br /> source clay sediments within development discharge water will be documented within th <br /> field notes. <br /> Following a minimum of 48 hours after well development and an initial water leve <br /> measurement, the wells will be sampled using a Teflon bailer cleaned with Alconox an <br /> deionized water. The bailer will be used first to obtain a sample from the surface of th <br /> water in the well prior to purging. Any subjective evidence of product detected in the wel; <br /> will be recorded. If no floating product is observed in the wells, a formation water sampl <br /> R <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.