My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008499
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2537
>
3500 - Local Oversight Program
>
PR0545857
>
ARCHIVED REPORTS_XR0008499
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 4:58:32 PM
Creation date
7/15/2020 2:50:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008499
RECORD_ID
PR0545857
PE
3528
FACILITY_ID
FA0005147
FACILITY_NAME
E-Z FOOD
STREET_NUMBER
2537
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
11914035
CURRENT_STATUS
02
SITE_LOCATION
2537 WATERLOO RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Well Pulum <br /> Before sampling commences, well casing storage water and interstitial water in the artificial <br /> sand pack shall be purged from the well using: (1) a positive displacement bladder pump <br /> constructed of inert non-wetting Teflon and stainless steel, (2) a pneumatic-airbtt pumping <br /> system,(3) a centrifugal pumping system,or(4)a PVC,Teflon or stainless steel bailer. Methods <br /> of purging will be assessed based on the well size, location, depth, accessibility, and known <br /> chemical conditions Individual well purge volumes are calculated from the casing volumes. In <br /> general, a minimum of 3 to 5 casing volumes will be purged. Wells which dewater or <br /> demonstrate slow recharge capacities 4 e., low yield wells which only recover to 70 percent of <br /> initial water column height after 1 hour) during purging activities may be sampled after fewer <br /> than 3 to 5 purging cycles. If a low yield well is to be sampled, sampling shall not take place <br /> until at least 70 percent of the previously measured water column has been replaced by <br /> recharge. Monitoring wells shall be purged according to the protocol flowchart presented in <br /> Plate A-3. Water removed from the wells will either be disposed or stored in 55-gallon DCT <br /> drums for future disposal according to proceedures outlined for contaminated soil cuttings in the <br /> Soil Sampling Protocol section above. Where appropriate, physical parameters (pH, specific <br /> conductance, and temperature) will be monitored by HETI field crew during well purging <br /> operations If necessary, purging may continue until all three physical parameters have <br /> stabilized. Stability shall be defined as a change of less than 0 2 pH units, less than 10 percent <br /> m mucro mhos, and less than 10 degree Centigrade. The pH meters shall be read to the nearest <br /> ±01 pH units Specific conductance meters shall be read to the nearest± 10 micro-mhos per <br /> centimeter Both types of meters shall be calibrated daily to manufacturer's specifications. <br /> Temperature shall be read to the nearest ±01 degree centigrade. Field data collected while <br /> developing,purging and sampling the wells will be entered onto the HETI Purge/Sample Sheet <br /> (Plate A-2). Copies of the Purge/Sample Sheets will be reviewed for accuracy and <br />. completeness for each well sampled <br /> a <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.