My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008544
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2537
>
3500 - Local Oversight Program
>
PR0545857
>
ARCHIVED REPORTS_XR0008544
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 9:55:37 PM
Creation date
7/15/2020 2:54:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008544
RECORD_ID
PR0545857
PE
3528
FACILITY_ID
FA0005147
FACILITY_NAME
E-Z FOOD
STREET_NUMBER
2537
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
11914035
CURRENT_STATUS
02
SITE_LOCATION
2537 WATERLOO RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E-Z SERVE PETROLEUM MARKETING COMPANY OF CALIFORNIA <br /> QUARTERLY GROUNDWATER MONITORING PROGRAM <br /> SAMPLING AND ANALYSIS PLAN <br /> The following sections describe the procedures and protocols followed during this quarterly <br /> groundwater monitoring event at the subject site <br /> Depth-To-Water Measurements <br /> Prior to sampling the groundwater monitoring wells, the wells were opened to the atmosphere for <br /> approximately one-quarter of one hour, allowing the static water level well to adjust to the open <br /> barometric pressure The depth-to-groundwater was then measured, using an oil-water interface <br /> probe The interface probe was lowered slowly until free product or water was encountered At that <br /> point,the mark on the interface probe wire was read to the nearest 0 01 feet at the permanent reference <br /> point on the top of the well casing If free product was encountered, the probe was lowered until <br /> water was encountered The difference between the two depths corresponded to the thickness of the <br /> free product The total depth of the well was then measured using the same probe If the presence of <br /> free product was questionable, a second check for free-product was make using a disposable bailer <br /> The disposable bailer was lowered into the water to approximately one-half the bailer length The <br /> bailer was then removed from the well and checked for the presence of free petroleum product or a <br /> product sheen <br /> In the event a dedicated bailer or purge tubing existed in the well, the dedicated equipment was <br /> removed prior to sampling, and temporarily stored in a clean plastic garbage bag <br /> The depth-to-water and total depth measurements, and the presence or absence of free product, <br /> were recorded on the field sampling forms In addition, comments regarding the condition of the well <br /> and/or containment box were also noted on the field sampling sheet at that tune Wells observed to <br /> contain a product sheen or free product on top of the water column were purged but not sampled <br /> Groundwater Monitoring WeU Purging <br /> The depth-to-water and bottom of well measurements were used to calculate the volume of <br /> purge water contained in one well volume The miumum purge volume was calculated to be three <br /> times the total well volume Once the minimum purge volume had been calculated, purging was <br /> started Purging was conducted using either a centrifugal pump connected to a dedicated Waterra® <br /> pump, a 2-inch diameter submersible pump, a bladder pump, or a disposable polyethylene bailer The <br /> type of equipment used to purge each well was selected based on the depth to water, the anticipated <br /> purge rate, the amount of sediment expected to be contained in the well, and the historical sampling <br /> records for each well The specific piece of equipment used was recorded on the Groundwater Sample <br /> Collection Record Temperature, pH, and specific conductance of the purge water was monitored <br /> during the purging process at regular intervals Purging was ceased when the monitored parameters <br /> stabilized (three consecutive reading not varying by more than 10-percent) and a minimum of three <br /> well volumes had been purged <br /> In the event a well dried out during purging, the well was allowed to recover to 80-percent of its <br /> original well volume, or for 8-hours,whichever was less, prior to collecting a groundwater sample <br />
The URL can be used to link to this page
Your browser does not support the video tag.