Laserfiche WebLink
1 <br /> . STANDARD OPERATING PROCEDURE <br />' AIR SPARGE, SOIL VAPOR EXTRACTION,AND COMBINED AIR SPARGE/SOIL VAPOR <br /> EXTRACTION PILOT TEST <br /> Vapor Extraction Pilot Test <br /> Before performing the vapor extraction pilot test (VEPT), any necessary air permits shall be obtained and <br />' the test will be performed in accordance with any requirements stated in the permit Ambient pressure <br /> readings will be measured at the observation wells prior to the start of the test The pilot test will be <br /> conducted by applying a vacuum to a well with a blower to extract soil-gas The test will be conducted at <br />' three steps of increasing applied vacuum The final step of the test will be conducted at the maximum <br /> applied vacuum of the blower A step will be considered complete when vacuum influence measured in <br /> observation wells stabilized for two consecutive readings <br />' The following measurements will be made during each step of the test <br /> • The vacuum applied to the well will be measured with a vacuum gauge The applied vacuum will be <br /> controlled and adjusted with dilution valve <br />' • The concentration of hydrocarbon volatiles and oxygen in the soil-gas extracted from the well will <br /> be monitored during each step of the test using a flame ionization detector (FID) or a photo <br /> ionization detector(PID), and Gastech®meter <br />' • The vacuum influence in observation wells will be measured in inches of water (vacuum) with <br /> Magnehelice gauges <br />' The soil-gas extraction flow rate at the extraction well will be measured during each step of the test, <br /> once the vacuum has stabilized, using a thermal anemometer, or pitot tube and Magnehelico gauges <br />' A soil-gas sample will be collected at the maximum applied vacuum in a TedlarTM bag for laboratory <br /> analysis The samples will be analyzed for volatile fuel hydrocarbons (VFH) using Modified EPA Method <br /> 8015B and for BTEX using EPA Method 8021E at a California DHS-certified lab The extracted soil-gas <br />' will be treated with an internal combustion engine, or thermal oxidizer The appropriate air quality control <br /> permit will be procured for the internal combustion engine, or thermal oxidizer <br />' Air Sparge Pilot Test <br /> The air sparge test will be performed by infecting atmosphenc air into the saturated zone through an air <br /> sparge well and monitoring the influence at observations wells Ambient groundwater level and DO <br /> readings will be measured at the observation wells prior to the start of the test The test will be performed at <br /> three different flow rates, 2, 5, and 10 acfm The test will be conducted at three steps of increasing flow <br /> I rate A step will be considered complete when the groundwater level and DO measured in observation wells <br /> stabilized for two consecutive readings, or at the discretion of personnel conducting the test The vapor <br /> extraction system will be operated during the air sparge pilot test The vapor extraction system will be <br /> operated at a constant flow rate to capture hydrocarbon vapors produce by air sparge Personnel conducting <br /> the test will determine the extraction flow rate <br /> The air sparge test will be conducted using a compressor, associated flow rate and pressure gauges, DO and <br /> I water level meters All above ground air pressurized piping will be metal or hose suitable to the application <br /> Prior to beginning the test the following measurements will be made at the surrounding observation wells <br /> • The groundwater level will be measured to the nearest 0 01 foot with a Solmst0 electronic interface <br /> probe, or equivalent in the observation wells <br /> • The down hole groundwater DO concentration in the observation wells <br />