My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2020 3:26:56 PM
Creation date
7/16/2020 3:06:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95242
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
61 SALP EVR Rotatable Product Adaptor <br /> INSTALLATION INSTRUCTIONS <br /> 2" Minimum Clearance between <br /> spill container cover and dust cap . 1 . 0 " Minimum Slope <br /> ry - <br /> OPW Spill Container Product Dust Cap <br /> with Drain Valve =T� <br /> 61 SALP Swivel <br /> Product Adaptor <br /> 11 Note : Use only a factory <br /> made nipple . Nipple must be <br /> Note : This is a typical installation for the cut square and deburred to <br /> Product OPW 61 SALP . Installation may provide a suitable sealing <br /> vary for your application . 1 surface . (Option : Use OPW <br /> FSA400 with nipple ) <br /> Step 1 <br /> The riser nipple in the spill container must be cut square and deburred . See drawing note for the correct distance <br /> between the top of the nipple and finished grade . ( Optional : Use a OPW FSA-400 Face Seal Adapter with nipple . <br /> Add 3 - 1 /4" to distance from top of nipple to finish grade ) . <br /> Step 2 (Optional ) <br /> Apply pipe dope to the nipple . Pipe dope to be non - hardening , gasoline resistant pipe thread seal compound . <br /> Step 3 <br /> Tighten the Rotatable Adaptor onto the nipple with a torque of 90 ft-lbs min . to 110 ftdbs max this will be enough <br /> torque to seat and seal the gasket . Use an OPW 61 SA-TOOL to install rotatable adaptor . <br /> Static Torque Test <br /> 1 . Using OPW 200459 Swivel Adaptor Torque Tool and OPW 634TT Product Cap , annually verify the static <br /> torque of the swivel adaptor by performing California ARB test procedure TP-201 A B . <br /> F00 VV0 <br /> A DOPER COMPANY <br /> 1 -800422-2525 Domestically <br /> 513 - 870-3315 Internationally <br /> www . opw-fc . com <br /> Copyright , 2009 - OPW Fueling Components Inc . , <br /> ,vw / / r;l Lr" Hamilton , OH <br /> Printed in U . S . A . p/n H12712PA rev . C - 2/09 <br /> Manufacture "OPW" Product ID : "61SALP" <br /> Date Manufactured : " MFG MMYY" <br /> MM = Month , YY=Year <br />
The URL can be used to link to this page
Your browser does not support the video tag.