Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for TOKAY SHELL as of October 07, 2020. <br /> Open violations from May 07, 2020 inspection <br /> Violation#208-Failure to conduct the designated UST operator visual inspection at least once every 30 <br /> days. <br /> 1)OBSERVATION:The designated operator failed to check and note the correct test dates for the 2019 monitoring <br /> system certification on the designated operator inspection reports. Monitoring system certification testing was <br /> conducted on 4/10/2019. <br /> REGULATION GUIDANCE: During the inspection, the designated operator shall check that all required testing and <br /> maintenance for the UST system have been completed and document the dates they were done. <br /> CORRECTIVE ACTION: Ensure that designated operators performing inspections at this facility are including all of <br /> the required information on the reports. <br /> 2) OBSERVATION: Designated operator reports were not signed within the required time frame. <br /> -The 6/7/2019-4/20/2020 designated operator reports were not signed by the owner/operator. <br /> REGULATORY GUIDANCE:Within 48 hours of the completion of the designated UST operator visual inspection, <br /> the designated operator shall sign and provide the owner or operator with a copy of the inspection report. Within 48 <br /> hours of being provided a signed copy of the report,the owner or operator shall provide a description of each <br /> corrective action taken or to be taken and shall sign and date the report, acknowledging the identified compliance <br /> issues. <br /> CORRECTIVE ACTION: Ensure all designated operator inspection reports are completed and signed within the <br /> required time frame in the future. <br /> 3)OBSERVATION: The designated operator failed to check and note all required items on the visual inspection <br /> reports.The incorrect and missing information included the following from the inspection reports: <br /> -The designated operator answered the question regarding UDC sensor locations but the site does not have UDCs. <br /> -Monitoring system certification, spill container, overfill prevention, secondary containment testing information was <br /> left blank. <br /> -The inspection date on the 5/9/2019 report was incorrectly stated as 4/11/2019. <br /> REGULATION GUIDANCE: During the visual inspection,the designated operator shall check that all required <br /> testing and maintenance for the UST system have been completed and shall check all required items on the report. <br /> CORRECTIVE ACTION: Ensure that designated operators performing visual inspections at this facility are including <br /> all of the required information on the reports. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 6 of 8 <br />