Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for TOKAY SHELL as of October 07, 2020. <br /> Open violations from May 07, 2020 inspection <br /> Violation#210-No employee present that were trained in the operation and maintenance of the UST system <br /> byaDO. <br /> OBSERVATION: The designated operator employee training was not performed. <br /> REGULATION GUIDANCE: The designated operator shall train facility employees in the proper operation and <br /> maintenance of the UST system at least once every 12 months. The training shall be conducted before the <br /> individual performs the duties of a facility employees.The training shall include, but is not limited to: <br /> 1. Operation of the UST system in a manner consistent with the facility's best management practices <br /> 2. Employee's role with regard to monitoring equipment as specified in the facility's monitoring plan <br /> 3. Employee's role with regard to spills and overfills as specified in the facility's response plan <br /> 4. Name of the contact person(s)for emergencies and monitoring equipment alarms <br /> Initial training shall also include a site-specific practical demonstration that provides both sharing information and <br /> evaluating knowledge for responding to emergencies, leak detection, monitoring alarms, spills and overfills. At least <br /> one of the facility employees present during operating hours shall have current training. <br /> CORRECTIVE ACTION: Ensure that employees have been trained by the designated operator, maintain the list on <br /> site, and submit a copy of the training records to the EHD. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#319-Failure to comply with the installation, inspection,or record keeping of the overfill <br /> prevention. <br /> OBSERVATION: The used oil tank did not have an overfill prevention system. <br /> REGULATION GUIDANCE:All underground storage tanks shall be equipped with an overfill prevention system that <br /> does not allow for manual override and meets one of the following requirements: <br /> 1. Alert the transfer operator when the tank is 90 percent full by restricting the flow into the tank or triggering an <br /> audible and visual alarm; or <br /> 2. Restrict delivery of flow to the tank at least 30 minutes before the tank overfills, provided the restriction occurs <br /> when the tank is filled to no more than 95 percent of capacity; and activate an audible alarm at least five minutes <br /> before the tank overfills; or <br /> 3. Provide positive shut-off of flow to the tank when the tank is filled to no more than 95 percent of capacity; or, <br /> 4. Provide positive shut-off of flow to the tank so that none of the fittings located on the top of the tank are <br /> exposed to product due to overfilling. <br /> CORRECTIVE ACTION: Immediately contact a properly licensed,trained, and certified contractor to install an <br /> approved overfill prevention system. Replacement of a mechanical flapper valve requires a permit and inspection <br /> by the EHD. If an external audio/visual alarm is replaced, provide a copy of the service receipt to the EHD. If an <br /> approved overfill prevention system can't be installed immediately,there is a possibility that the used oil UST system <br /> may be red tagged to prevent fuel inputs. <br /> Page 7 of 8 <br />