Laserfiche WebLink
AffordaDynamic Back Pressure Test <br /> o d a e$t 416 2nd Street ® TP 201.4 <br /> Galt, Ca. 95632 <br /> (209)744-0112(800)524-9087 FAX(209)744-0116 Z Static Pressure Decay Test <br /> TP 201.3 <br /> Owner/Contractor/Eng: GRIN INVESTMENTS TEST DATE: 11/12/20019 TIME: 1135 UST ® AST ❑ <br /> TECHNICIAN NAME: <br /> SITE NAME: ARCO STOCKTON ❑FELIX RAMIREZ PT [:1Startup Test ® Compliance Test <br /> Address: 6009 N EL DORADO ST I declare, under penalty of perjury under the laws of the state <br /> of California that based on information and belief formed <br /> City: STOCKTON CA 95207 after reasonable inquiry, the statements and information <br /> Inspector: <br /> Phone: 925-724-8010 provided in the document are true, accurate,and complete. <br /> Contact: GARY Present [_1Not Present <br /> TECH SIGNATURE: <br /> Confirmation# 19-27839 Permit or Facility#N-9259 <br /> #DISPENSERS 6 DISPENSER Make:WAYNE NOZZLE Make:VST PV Valve Make:HUSKY <br /> #TOTAL NOZZLES 12 Model: Model:EVR Model: 5885 <br /> MANIFOLDED: Yes ® No❑ BALANCE ® ASSIST ❑ Assist Type: <br /> Tank 1 Tank 2 Tank 3 Tank 4 TOTAL <br /> Fuel Grade 87 91 ALL Initial pressure before testing- 1.03 "we <br /> #Nozzles per Tank 12 12 12 <br /> EQUIPMENT <br /> Actual Tank Capacity 25438 11907 37349 Deca Blockage: <br /> Gasoline Volume 11673 6006 17679 Incline Manometer Incline Manometer <br /> ❑ ❑ <br /> Ullage(Capacity minus Volume) 13758 5901 19659 Magnehelic Guage Magnehelic Guage <br /> Phase I System Type:2pt EVR Coaxial EVR EVR EVR Digital Manometer Digital Manometer <br /> ® I ❑ <br /> Initial Test Pressure(Inches Water)2/0 2.0 Equipment Calibration Date: 09-01-19 <br /> 2.0 Drift Check End Value: 0 <br /> PSI 1 Minute(Inches Water) Nitrogen Intro.Point: PHASE 1 <br /> PSI A 2 Minutes 1.99 Allowable Fill Time @ 2 scfm 13MIN SEC 12 <br /> PSI @ 3 Minutes 1.98 <br /> PSI g 4 Minutes 1.97 Time 1.3 MIN 44 SEC <br /> Final Pressure @ 5 Minutes(Inches Water) 1.96 <br /> 1.91 Time 2: <br /> Allowable Final Pressure(CARB) <br /> Time 3• <br /> Liquid Removal Check,Dynamic Back <br /> ------- ------- ------- ------- PASS Pressure(if due),and Parts& <br /> Repairs Are Listed on Page 2. <br />