Laserfiche WebLink
AffordaDynamic Back Pressure Test <br /> o d a e$t 416 2nd Street ® TP 201.4 <br /> Galt, Ca. 95632 <br /> (209)744-0112(800)524-9087 FAX(209)744-0116 Z Static Pressure Decay Test <br /> TP 201.3 <br /> Owner/Contractor/Eng: TOWN&COUNTRY TEST DATE: 12/6/2018 TIME: I UST ® AST ❑ <br /> TECHNICIAN NAME: <br /> SITE NAME: GRIND INVESTMENTS ARCO AMPM ❑ZANE NIMMO PT [:] Startup Test ® Compliance Test <br /> Address: 6009 N.EL DORADO STREET AGENCY- SJVAPCD <br /> City: STOCKTON,CA 95207 I declare, under penalty of perjury under the laws of the state Inspector:UDO <br /> of California that based on information and belief formed <br /> Phone: after reasonable inquiry, the statements and information <br /> Contact: <br /> provided in the document are true, accurate,and complete. Present ® Not Present❑ <br /> Confirmation# 18-26258 TECH SIGNATURE: <br /> Permit or Facility#N-9259-1-0 <br /> #DISPENSERS 6 TDISPENSER Make: WAYNE NOZZLE Make: V S T PV Valve Make:HUSKY <br /> #TOTAL NOZZLES 12 Model: Model:E VR Model:5885 <br /> MANIFOLDED: Yes ® No❑ BALANCE ® ASSIST ❑ Assist Type:VR 203/204 <br /> Tank I Tank 2 Tank 3 Tank 4 TOTAL <br /> Fuel Grade 87 91 ALL Initial pressure before testing-0.12 "we <br /> #Nozzles per Tank 12 __ __ 12 <br /> EQUIPMENT <br /> Actual Tank Capacity 25,431 11,887 37,318 Decay: Blockage: <br /> Gasoline Volume 14,369 3,821 189190> > > Incline Manometer ❑ Incline Manometer ❑ <br /> Ullage(Capacity minus Volume) 11,062 8,086 199148 Magnehelic Guage ❑ Magnehelic Guage <br /> Phase I System Type:2pt EVR Coaxial O p W EVR <br /> Digital Manometer ® Digital Manometer ❑ <br /> Initial Test Pressure(inches water)2i0 2,00 Equipment Calibration Date: 10/13/18 <br /> 2.03 Drift Check End Value: .00 <br /> PSI 1 Minute(Inches Water) Nitrogen Intro.Point: 87 VA <br /> PSI @ 2 Minutes 2.06 <br /> PSI @ 3 Minutes Allowable Fill Time 2 scfm 12:34 <br /> 2.09 <br /> PSI @ 4 Minutes 2.13 Time 1:4:19 <br /> Final Pressure @ 5 Minutes(inches water) 2.16 Time 2: <br /> Allowable Final Pressure(CARIB) 1.91 Time 3: <br /> Liquid Removal Check,Dynamic Back <br /> Pressure(if due),and Parts& <br /> _______ <br /> ------- ------- ------- PASS Repairs Are Listed on Page 2. <br />