My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
6009
>
2300 - Underground Storage Tank Program
>
PR0542116
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/24/2020 2:31:24 PM
Creation date
7/20/2020 9:31:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0542116
PE
2351
FACILITY_ID
FA0024188
FACILITY_NAME
GRIN INVESTMENTS INC DBA: ARCO AM/PM
STREET_NUMBER
6009
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
08126064
CURRENT_STATUS
01
SITE_LOCATION
6009 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DYNAMIC BACK PRESSURE TEST DATA (BLOCKAGE) TECHNICIAN: ZANE NIMMO <br /> Cert#0083 Exp. <br /> Site: GRIND INVESTMENTS ARCO AMPM Date: 12/6/2018 Time: <br /> Nozz/Fuel 20 CFH 60 CFH 100 CFH PASS/FAIL Nozz/Fuel 20 CFH 60 CFH 100 CFH PASS/] <br /> Grade (.15"Water) (.45"Water) (.95"Water) Grade (.15"Water) (.45"Water) (.95"Water) <br /> -- 60CFH 80CFH --- 60CFH 80CFH - <br /> 1 ALL -- .31 .49 PASS 2 ALL -- .32 .47 PA" <br /> 3 ALL -- .30 .48 PASS 4 ALL -- .27 .43 PA" <br /> 5 ALL -- .33 .50 PASS 6 ALL -- .28 .42 PA" <br /> 7 ALL -- .32 .44 PASS 8 ALL -- .31 .47 PA" <br /> 9 ALL -- .27 .43 PASS 10 ALL -- .29 .42 PA" <br /> 11 ALL -- .31 .47 PASS 12 ALL -- .28 .45 PA" <br /> LIQUID REMOVAL CHECK **See Long Form Test Report for wet Failure Testing Blockage Tester Integrity: <br /> D=Dry 1 .44"w.c. @ 5 minutes PASS <br /> 1 ®DRY 2 E DRY 3 ®DRY 4 ®DRY 5 ®DRY 6 ®DRY 7 ®DRY 8 ®DRY ❑DRY <br /> M1 ml ml ml ml ml ml ml ml <br /> ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY <br /> M1 ml ml ml ml ml ml ml ml <br /> ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY <br /> M1 ml ml ml ml ml ml ml ml <br /> [-]DRY ❑DRY ❑DRY ❑DRY [-]DRY ❑DRY ❑DRY [-]DRY ❑DRY <br /> M1 ml ml ml ml ml ml ml ml <br /> ® Job Complete Repairs Done to Pass Test: <br /> ❑ Not Complete Repairs Still Needed: <br /> Parts: None Drop Tube rings Fill Adaptor Gaskets Hoses Whip Hose <br /> Nozzles Breakaways PV Valves Others: <br />
The URL can be used to link to this page
Your browser does not support the video tag.