Laserfiche WebLink
DYNAMIC BACK PRESSURE TEST DATA (BLOCKAGE) TECHNICIAN: ZANE NIMMO <br /> Cert#0083 Exp. <br /> Site: GRIND INVESTMENTS ARCO AMPM Date: 12/6/2018 Time: <br /> Nozz/Fuel 20 CFH 60 CFH 100 CFH PASS/FAIL Nozz/Fuel 20 CFH 60 CFH 100 CFH PASS/] <br /> Grade (.15"Water) (.45"Water) (.95"Water) Grade (.15"Water) (.45"Water) (.95"Water) <br /> -- 60CFH 80CFH --- 60CFH 80CFH - <br /> 1 ALL -- .31 .49 PASS 2 ALL -- .32 .47 PA" <br /> 3 ALL -- .30 .48 PASS 4 ALL -- .27 .43 PA" <br /> 5 ALL -- .33 .50 PASS 6 ALL -- .28 .42 PA" <br /> 7 ALL -- .32 .44 PASS 8 ALL -- .31 .47 PA" <br /> 9 ALL -- .27 .43 PASS 10 ALL -- .29 .42 PA" <br /> 11 ALL -- .31 .47 PASS 12 ALL -- .28 .45 PA" <br /> LIQUID REMOVAL CHECK **See Long Form Test Report for wet Failure Testing Blockage Tester Integrity: <br /> D=Dry 1 .44"w.c. @ 5 minutes PASS <br /> 1 ®DRY 2 E DRY 3 ®DRY 4 ®DRY 5 ®DRY 6 ®DRY 7 ®DRY 8 ®DRY ❑DRY <br /> M1 ml ml ml ml ml ml ml ml <br /> ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY <br /> M1 ml ml ml ml ml ml ml ml <br /> ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY <br /> M1 ml ml ml ml ml ml ml ml <br /> [-]DRY ❑DRY ❑DRY ❑DRY [-]DRY ❑DRY ❑DRY [-]DRY ❑DRY <br /> M1 ml ml ml ml ml ml ml ml <br /> ® Job Complete Repairs Done to Pass Test: <br /> ❑ Not Complete Repairs Still Needed: <br /> Parts: None Drop Tube rings Fill Adaptor Gaskets Hoses Whip Hose <br /> Nozzles Breakaways PV Valves Others: <br />