SAN J O A R N Environmental Health Department <br /> i , �V <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> AGS FUEL INC DBA CIRCLE K CHEVRON 1 1490 S MAIN ST, MANTECA March 03, 2020 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 204 CCR 2712(i)Current monitoring plan approved by the EHD not found on site. <br /> OBSERVATION:An approved copy of the monitoring plans were not available for inspection. <br /> REGULATION GUIDANCE:A copy of these plans shall be accessible on site at all times. <br /> CORRECTIVE ACTION: Immediately locate and retain a copy on site. <br /> This is a minor violation. <br /> 205 CCR 2712(i), 2634(e)Failure to submit a current UST Response Plan and have it available onsite. <br /> OBSERVATION:An approved copy of the response plan was not available for inspection. <br /> REGULATION GUIDANCE:A copy of this plan shall be accessible on site at all times. <br /> CORRECTIVE ACTION: Immediately locate and retain a copy on site. <br /> This is a minor violation. <br /> 209 CCR 2716(a-e) Failure to conduct the designated UST operator visual inspection at least once every 30 days. <br /> OBSERVATION: Designated operator reports were not signed within the required time frame. <br /> -The 3/28/2019 designated operator report was signed by the owner/operator on 4/18/2019. <br /> -The 6/13/2019 designated operator report was signed by the owner/operator on 8/8/2019. <br /> -The 7/11/2019 designated operator report was signed by the owner/operator on 8/18/2019. <br /> REGULATORY GUIDANCE:Within 48 hours of the completion of the designated UST operator visual inspection, <br /> the designated operator shall sign and provide the owner or operator with a copy of the inspection report. Within 48 <br /> hours of being provided a signed copy of the report,the owner or operator shall provide a description of each <br /> corrective action taken or to be taken and shall sign and date the report, acknowledging the identified compliance <br /> issues. <br /> CORRECTIVE ACTION: Ensure all designated operator inspection reports are completed and signed within the <br /> required time frame in the future. <br /> This is a minor violation. <br /> 313 HSC 25290.1,25290.2, 25291 Failure to construct, operate, and maintain primary containment as product-tight. <br /> OBSERVATION:Approximately 1 cup of liquid was found in UDC 5/6 and UDC 7/8, indicating a leak in the primary <br /> containment.The diesel meter in UDC 7/8 was actively leaking at the time of the inspection. <br /> REGULATION GUIDANCE:All primary containment for the UST system must be product tight. <br /> CORRECTIVE ACTION: Immediately have a properly licensed,trained, and certified contractor repair or replace the <br /> failed component(s), under permit and inspection of the EHD if necessary. <br /> This is a minor violation. <br /> FA0023750 PR0541436 SCO01 03/03/2020 <br /> EHD 23-01 Rev.9/20/2019 Page 5 of 7 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />