My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
2300 - Underground Storage Tank Program
>
PR0231465
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2020 1:53:30 PM
Creation date
7/20/2020 11:29:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231465
PE
2361
FACILITY_ID
FA0003739
FACILITY_NAME
Colonial Energy CE 40134 (DBA Power Mart)
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POMECO Multi -Port Spill Container Manhole <br />Installation Instructions <br />1. Mark off finish grade. (See Figure 1.) <br />Finish Grade <br />Figure 1 <br />2. Set multi -port manhole assembly (skirt, ring, and <br />cover) to the final grade position. (See Figure <br />2.) <br />Finish Grade <br />I <br />Figure 2 <br />Note: It is strongly recommended that POMECO <br />covers be installed with the following minimum <br />clearances. Sheet metal skirts should have <br />adequate clearance between the tank sump riser <br />sidewall and or the sump top hat. A minimum of <br />one and a half inches clearance on all sides is <br />recommended between the POMECO skirt and <br />the tank sump wall or the sump top hat wall. A <br />minimum of two inches clearance is <br />recommended between the bottom of the <br />POMECO skirt and the horizontal surface of the <br />tank sump or sump top hat. These clearances <br />are recommended to allow adequate water <br />migration away from the sumps. Great care <br />should be used to maintain the recommended <br />clearances when setting the rings and pouring <br />rigure s <br />3. Remove the cover and measure the distance <br />from the top of the tanks to the final grade. <br />4. Cut the riser(s) from the underground tank so <br />that both the fill and vapor risers are set below <br />the final grade. Use the dimensions below: <br />Spill Container Inches below grade (L) <br />5 Gal. Cast Iron Base 15'/2" <br />5 Gal. Composite Base 17'/2" <br />7.5 Gal. Cast Iron Base 19 1/2" <br />7.5 Gal. Composite Base 21 1/2" <br />Note: Add an extra 3-1/4" when using an OPW <br />FSA -400 Face Seal Adaptor. (See Figure 2.) <br />5. Deburr and thoroughly clean riser pipe(s). <br />6. Apply pipe dope to riser(s). The pipe dope is to <br />be a non -hardening, gasoline resistant, pipe <br />thread seal compound. <br />7. Install OPW FSA -400 Face Seal Adapter onto <br />riser. (Recommend Torque, 4" NPT, 125 ft -lbs <br />min. to 250 ft -lbs max.). Apply pipe dope to <br />FSA -400. The pipe dope is to be a non - <br />hardening, gasoline resistant, pipe thread seal <br />compound. This is optional for spill containers <br />that are on the vapor lines. <br />8. Thread the spill containers on hand tight. <br />Note: Do NOT attempt to completely tighten the <br />containment bucket by using the containment <br />bucket mounting ring at the top of the bucket. <br />9. Inspect the containment bucket gasket(s) and <br />the ring gasket for damage. Replace the <br />gasket(s) if they are damaged. <br />10. Apply an even bead of PISCES SL -1100 to the <br />topside of the containment bucket gasket(s). <br />(See Figure 4.) <br />r-igure 4 <br />11. Apply an even bead of PISCES SL -1100 to the <br />topside of the ring gasket. (See Figure 4.) <br />12. Replace the multi -port cover, centering the <br />riser(s) as close as possible in the containment <br />openings. Be very careful not to move or <br />damage the gaskets. <br />POMECO Multi port Spill Container Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.