My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
2300 - Underground Storage Tank Program
>
PR0231465
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2020 1:53:30 PM
Creation date
7/20/2020 11:29:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231465
PE
2361
FACILITY_ID
FA0003739
FACILITY_NAME
Colonial Energy CE 40134 (DBA Power Mart)
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13. Using the 61SA-TOOL, tighten the spill <br />container(s) onto the riser(s) with a minimum <br />torque of 125 ft. -lbs. and a maximum torque of <br />250 ft. -lbs. <br />14. The bolt holes in the multi -port cover must line <br />up with the bolt holes in the containment bucket <br />mounting ring. <br />15. Maintenance or as needed: Apply an even bead <br />of PISCES SL -1100 onto the bottom of the <br />mounting ring before assembling the <br />containment bucket mounting ring and the <br />mounting ring onto the multi -port cover. (See <br />Figure 5.) <br />Bolt Beveled Washer <br />evel Facing Down) <br />Mounting Ring i \' hread Seal Washer <br />SCES SL -1100 <br />i' <br />i <br />ontainment Bucket <br />Y Mounting Ring <br />Figure 5 <br />16. Install the beveled thread seal flat washer and <br />the thread seal washer onto the bolts for the <br />mounting ring. (See Figure 5.) <br />Note: Install the beveled thread seal flat washer <br />on the bolt with the beveled surface away from <br />the bolt head. Install the thread seal washer to <br />seat between the flat washer and the mounting <br />ring. <br />17. Apply PISCES SL -1100 to each bolt prior to <br />inserting them into the mounting ring. <br />18. Tighten the mounting ring retaining bolts until <br />the containment bucket gasket makes contact <br />with the multi -port cover. Then, in a crossing <br />pattern, torque the bolts down between 15 to 20 <br />ft. -lbs. <br />Figure 6 <br />19. Apply an even bead of PISCES SL -1100 around <br />the 5/16" hex bolts after final tightening. <br />20. Install the spill bucket covers. (See Figure 6.) <br />21. (Optional): Install the product identification disc <br />on the spill bucket cover and multi -port cover in <br />the I.D. disc recess. <br />22. Cover the multi -port perimeter ring and cover <br />with plastic to prevent concrete from settling in <br />the drainage areas. <br />23. It is required that the perimeter ring and skirt <br />assembly, and the multi -port cover be set as an <br />assembled unit, with the bolts engaged. Failure <br />to engage the bolts may result in the distortion of <br />the ring and improper fit of the ring to cover after <br />the concrete is poured. <br />24. When pouring the concrete, hand shovel or <br />trowel the concrete around the multi -port <br />assembly to prevent the unit from moving or <br />shifting, which can cause alignment problems <br />and future maintenance problems. <br />Note: Do not stand on the multi -port before the <br />concrete has set up. <br />25. It is recommended that the paved contours <br />around POMECO covers be adequately sloped <br />to direct water flow away from the cover, and <br />directing water runoff from adjacent areas away <br />from POMECO covers. (See Figure 7.) <br />Figure 7 <br />26. Remove the plastic after the concrete has set <br />up. <br />27. After installation is complete, water test the <br />multi -port fixture. The recommended water test <br />procedures include: <br />a) Spraying water on cover(s) for 5 to 10 <br />minutes, using a commonly available <br />watering device such as a lawn sprinkler. <br />b) Standing water test, not to exceed '/2" in <br />water depth for a period of 5 to 10 minutes. <br />Note: The containment bucket consists of three <br />components steel top ring, bellows, and bucket <br />bottom. These parts are held together with stainless <br />steel retaining bands. <br />POMECO Multi port Spill Container Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.