My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
2300 - Underground Storage Tank Program
>
PR0231465
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2020 1:53:30 PM
Creation date
7/20/2020 11:29:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231465
PE
2361
FACILITY_ID
FA0003739
FACILITY_NAME
Colonial Energy CE 40134 (DBA Power Mart)
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 6: APPLY GREASE TO DROP TUBE <br />Apply black moly grease to the inside diameter of the <br />upper drop tube. Make sure coverage is completely <br />around the tube as shown in Figure 6. <br />Figure 6 <br />STEP 7: APPLY GREASE TO POLYPAK SEAL <br />Ensure that the polypak seal is installed on the inlet <br />tube with the lip up as shown in Figure 7. Apply black <br />moly grease to the polypak as shown. Make sure cover- <br />age is completely around the polypak seal. <br />Inlet <br />Figure 7 <br />STEP 8: INSTALL INLETTUBE <br />Ensure polypak <br />lip is up <br />Polypak�, <br />"—Apply grease <br />around polypak <br />Insert the inlet tube into the upper tube until the upper <br />tube seats against the flange on the inlet tube. Ensure <br />polypak is inserted evenly and stays in inlet tube <br />groove. <br />3 <br />Figure 8 <br />NOTE: Testable inlet tube must have cable port in <br />line with float. Testable inlet tube bottoms out on <br />stop, it does not bottom out on inlet flange. See Fig- <br />ure SA <br />Cable port must be in <br />line with float <br />igure 8A <br />'estable Models Only <br />SEE PAGE 8 FOR INSTRUCTIONS USING THE 71 SO - <br />TOOL. <br />SEE PAGE 9 FOR INSTRUCTIONS USING THE 71 SO- <br />TOOLC. <br />SEE PAGE 10 FOR INSTRUCTIONS USING THE 71SO- <br />TOOLCT. <br />Note: testable 71 SO models ending with a "T' require the <br />71 SO-TOOLCT or modified 71 SO -TOOL or 71 SO- TOOLC <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.