My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
2300 - Underground Storage Tank Program
>
PR0231465
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2020 1:53:30 PM
Creation date
7/20/2020 11:29:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231465
PE
2361
FACILITY_ID
FA0003739
FACILITY_NAME
Colonial Energy CE 40134 (DBA Power Mart)
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71 SO -TOOL PROCEDURE BELOW, <br />FOR 71 SO-TOOLC, SEE PAGE 9 <br />FOR 71 SO-TOOLCT, SEE PAGE 10 <br />Note: 71 SO -TOOL can only be used with testable <br />overfill valves if modified as shown below. A 2" <br />wide slot must be added to accommodate cast lug. <br />STEP 9A: INSERT 71 SO -TOOL OVER INLET TUBE <br />To install the 71 SO -TOOL (sold separately) over the inlet <br />tube, first loosen all three knobs, so the tool can pass <br />freely over the inlet tube flange. Align the slot on the <br />tool with the key on the inlet tube and insert the tool <br />down. See Figure 9A. <br />Loosen all <br />Tool slot 1"_k� <br />View holes <br />Hand <br />tighten <br />knobs <br />evenly <br />Figure 9A Figure 10A <br />STEP 10A: TIGHTEN THE 71 SO -TOOL <br />Use the three view holes to ensure that the tool seats <br />out flat against the top of the inlet tube. To prevent <br />vertical movement of the tool during drilling, hand <br />tighten all three knobs evenly to the upper drop tube. <br />See Figure 10A. <br />STEP 11A: PREPARE DRILL AND BIT <br />Confirm that the stop on the 3/16" drill bit supplied <br />with the 71 SO -TOOL is in the correct position before <br />drilling. The stop is factory installed at a distance be- <br />tween 2" to 2-1/16" from the tip with the 71 SO -TOOL. If <br />the stop is not at the correct position it must be fixed <br />before drilling. <br />CAUTION: If the drill stop is not in the proper loca- <br />tion failure of a pressure decay leak test may result. <br />Tip to stop dimension must be <br />2" to 2-1/16". <br />Figure 11 A <br />STEP 12A: DRILL HOLES <br />With the inlet tube and 71 SO -TOOL in place, carefully <br />drill a 3/16" diameter hole in the upper tube using the <br />drill bushing in the knob as a guide. The drill stop is po- <br />sitioned so it will bottom out against the knob after the <br />bit has drilled through the upper drop tube. If the stop <br />is positioned wrong either no hole will be drilled, or a <br />through hole could potentially be drilled through the <br />inlet tube. If no hole is drilled return to step 11 A and <br />check the stop dimension. If a hole is drilled through <br />the inlet tube or into the screw hole the assembly is not <br />salvageable. Drill (2) more holes in the two remaining <br />knobs. <br />Figure 12A <br />
The URL can be used to link to this page
Your browser does not support the video tag.