My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008415
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4648
>
3500 - Local Oversight Program
>
PR0545864
>
ARCHIVED REPORTS_XR0008415
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2020 9:56:45 AM
Creation date
7/21/2020 9:48:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008415
RECORD_ID
PR0545864
PE
3528
FACILITY_ID
FA0004530
FACILITY_NAME
MARLOWE PROPERTY
STREET_NUMBER
4648
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
4648 WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27 September 1996 <br /> AGE-NC Project No 95-0104 <br /> Page 4 of 4 <br /> 42 RECOMMENDATIONS <br /> Based upon data collected during the August 1996 sampling event, AGE has the following <br /> recommendations <br /> • Additional ground water monitoring wells, screened appropriately above surface ground <br /> water, will be required at the site We recommend the installation of at least two additional <br /> monitoring wells at the site The new wells should be installed closer to the former UST <br /> excavation than the present wells <br /> • Consideration should be given towards completing new ground water monitoring wells at the <br /> site with multiple screened intervals to accommodate future fluctuations of ground water <br /> elevation, and to monitor HVOC species and concentrations in the ground water column <br /> • The next quarterly sampling event should be scheduled for November 1996 Any additional <br /> wells should be installed at the site prior to performance of the next quarterly monitoring <br /> Samples collected from additional wells should be analyzed for MTBE in addition to TPH-g, <br /> BTE&X and HVOCs If MTBE is not detected in ground water samples collected during the <br /> next monitoring event, then analysis for MTBE during future sampling events should not be <br /> necessary <br /> • A revised Corrective Action Plan will be submitted during the fourth quarter of 1996 Upon <br /> final approval of the revised CAP, a Remedial Action Work Plan will be prepared for the <br /> installation of a remediation system <br /> 5.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly upon <br /> analytical results provided by an independent laboratory Evaluations of the geologic/hydro- geologic <br /> conditions at the site for the purpose of this investigation are made from a limited number of available <br /> data points (e g ground water samples), and subsurface conditions may vary away from these data <br /> points No other warranty, expressed or implied, is made as to the professional recommendations <br /> contained in this report <br />
The URL can be used to link to this page
Your browser does not support the video tag.