My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4907
>
3500 - Local Oversight Program
>
PR0545865
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2020 10:04:37 AM
Creation date
7/21/2020 9:58:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545865
PE
3528
FACILITY_ID
FA0009358
FACILITY_NAME
COZAD TRAILER SALES LLC
STREET_NUMBER
4907
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710068
CURRENT_STATUS
02
SITE_LOCATION
4907 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Qemical Hazards <br /> Use personal protective equipment indicated in Section IS- <br /> 44 Conduct direct reading air monitoring to evaluate respiratory and <br /> explosion hazards (list instrument, action level, monitoring location, and <br /> action to be taken in Section 19). <br /> Consult DHSO for personal air monitoring. <br /> TPmnerature Hazards <br /> Heat Stress <br /> When temperature exceeds 70°F, take frequent breaks in shaded area. <br /> Unzip or remove coveralls during breaks. Have cool water or, electrolyte <br /> repienishment solution available. Drink small amounts frequently to <br /> avoid dehydration. Count the pulse rate for 30 seconds as early as <br /> possiaie in the rest period. If the pulse rate exceeds 110 beats per <br /> minute at the beginning of the rest period, shorten the work cycle by <br /> one-third. <br /> Cold Stress <br /> Wear multilayer cold weather outfits. The outer layer should be of wind <br /> resistant fabric. <br /> - W to -30' F total work time is 4 hours Alternate 1 hour in and l hour <br /> - out of the low-temperature area_ Below -30*F,consult industrial <br /> hy8ienisL <br /> Drink warts fluid_ Provide warts smelter for resting. Use buddy . <br /> system. Avoid heavy sweating. <br /> A3014-CP 7 <br /> Jolt 11 las` <br />
The URL can be used to link to this page
Your browser does not support the video tag.