Laserfiche WebLink
of 30-Inches. The hammer olows required to drive the 3-Inch sampler,converted to equivalent <br /> standard penetration counts(N-value). <br /> The soils will be classified In accordance with the procedures of the Unified Soil Classification <br /> System(USCS). <br /> At each sampling Interval,or change In Ilthology,one brass or stainless steel llner wlll be collected <br /> for laboratory analysis. This sample will be covered with aluminum foil and sealed with plastic <br /> caps. A completed sample label will be placed on the liner. Chaln-of-custody forms will be <br /> completed In the field and the samples will be placed and transported in insulated containers at <br /> a temperature of approximately 4°C to a State Certified Analytical Laboratory. <br /> All samples will be collected In such a manner as to minimize the volatilization or oxldatirrt of a <br /> sample due to agitation/mixing upon handling. <br /> At each sampling Interval,the soil from one of the brass liners will be placed In an airtight glass <br /> Jar and allowed to equllibriate,after which the air In the Jar will be monitored using an OVA. If <br /> significant organic vapors are detected with the OVA the appropriate brass sample liners will be <br /> saved for laboratory analysis. Other field screening steps may be used for other analytes, <br /> EQUIPMENT CLEANING <br /> 1. Downhole equipment(augers,well casing,sampler)will be steam cleaned prior to each boring. <br /> 2. Sampling equipment(sp!it-spoon driver sampler)will be washed with a brush Ina solution of TSP and <br /> potable water,then rinsed with potable water followed by rinsing with distilled water prior to each drive sample. <br /> Rinse water will be collected and stored In metal and/or plastic drums on-she. <br /> 3. All downhole equipment,and vehicles(when warranted)will be steam cleaned prior to leaving site. <br /> 4. All rinse water will be collected and translerred Into metal and/or plastic drums and stored on-site until <br /> - laboratory analysis results are made available to determine water dlspositicn. <br /> w SPOILS AND CUTTINGS <br /> Soil cuttings and other hazardous residuals from the drilling operations will be contained In labeled steel drums <br /> on-she until laboratory analysis determined material deposition, The final deposition of the material Is the <br /> responsibility of the client,GPI will Instruct the client of the necessary permits and dispositions procedures <br /> based on laboratory analysis results. Soil material determined to be contaminated,are required to be removed <br /> by a�11 an at o s wast an approved landfill, Non-contaminated soil material can be <br /> transported to County of Sonor.a Cot?ntKLan fill or buried on site,upon approval and with documentation, <br /> by this agent Wastes that are de o be hazardous must be properly disposed of and cannot be <br /> stored on site for more than 90 days. <br /> SAMPLE HANDLING/QA/QC ELEMENTS <br /> _., �gmnit3.4,�ellnd <br /> All sample containers will be labeled In the fleld. All sample labels will contain the following; <br />