Laserfiche WebLink
;2 tggym-. -fi�p. .r <br /> M, M IF <br /> . <br /> Environmental Compliance Consulting <br /> OVERVIEW <br /> Three underground tanks were removed; one 1000 gallon gasoline tank in April, <br /> and two diesel tanks (one 5000 gallon capacity, the other 10,000 gallon cap.) <br /> removed in June. The diesel tanks showed absolutely no evidence of perimeter <br /> soil contamination. The gasoline tank soil showed positive on the north (fill) <br /> end only from two 'separate' laboratories. This soil from the gas tank <br /> excavation is spread on and covered by 'poly'sheating on the far east border <br /> of the property, it's total volume approximately 10 yd3. <br /> This original stockpile of soil and all existing excavations and piles were <br /> again sampled by Greg Reed of Universal Engineering [witnessed by Darlene Reuss) <br /> on 10 January 1990 and transported to Precision Analytical Ltb in Richmond. <br /> The maximum contamination from all areas was indicated in the 'original' <br /> soil stockpile where gasoline showed 90 mg/kg and diesel at 190 mg/kg. <br /> This evident cross-contamination of diesel in the original stockpile most <br /> likely resulted from the 'front end' loader which transferred the soil from <br /> the excavation to the stockpile. <br /> REMEDIATION PROCEDCRES <br /> A'permic to aerate has been applied for to the San Joaquin County Air Pollution <br /> Control District. The soil will be spread on 'poly sheeting' and turned <br /> daily , as weather permits. The covered soil, in the interl-m will be subject <br /> to normal soil bacreria and fungi which break down the larger(12 to 14 carbon <br /> chains) semivolatile fragments of diesel. The soil will be resampled and <br /> analyzed as necessary until contaminant levels are below action limits. <br /> Resampling will occur after notification to San Joaquin County Environmental <br /> Health Department. There is not presently, nor has there been in the past, <br /> any imminent danger to groundwater. Groundwater was not present during all <br /> -- - - <br /> - �� -------excavation-procedures-and-all-contaminated-soils-removed-are-on-and-covered- _ — _ - <br /> with impermeable ?cly sheeting. <br /> Page 3 <br />