Laserfiche WebLink
r Ju4 17 00 1 1 : 48aI 51(0-.�791 -3305 <br /> p. 4 <br /> In order to perform the Scope of Werk generally outlined above,1PCA proposes a budget of <br /> $4,041.80 for the environmental assessment based on the assumptions listed below. The costs i <br /> include Professional fees, driller charges, travel, per diem, equipment rental, chemical ' <br /> analyses and report preparation. Any additional work will be negotiated and additional costs <br /> agreed on prior to that additional work being completed. A�opy'of JPCA Fee Schedule is # <br /> enclosed. <br /> i <br /> I <br /> 1. The depth to groundwater and the gradient are generally as assumed. <br /> i 1 <br /> 2. Soil cuttings arc not contaminatcd and can be disposed of on sate. Disposal of any <br /> contaminated soil is the responsibility of the property owner. <br /> 3. Laboratory analyses are conducted on a normal (10 day) turnaround schedule. <br /> .i <br /> i <br />'i 4. Water and electric power arc available on site during the drilling. <br /> 5. The county and/or other regulatory agencies do not request data that is in addition to wl,•hat is <br /> proposed here. <br /> 'I <br /> Proiccts of this [ralurc can he completed by our firm in about three weeks. The permitting for <br /> the drilling of the borings may delay our ability to commenceimmediately. <br /> For your convenience, we have enclosed a standard form of 4reement we routinely use for <br /> projects of this nature. One signed copy of this agreement will serve as our notice to begin <br /> work. <br /> I trust that you will find this proposal satisfactory to your needs- if you have any questions, <br /> please contact me at (510) 505-0722. <br /> Sincerely, <br /> l <br /> I <br /> John P. Cummings <br /> Principal <br /> Enclosures <br /> 3 1 <br /> i <br /> I <br /> E <br /> j <br />