Laserfiche WebLink
1 <br /> M <br /> MANAGE115 DES tNE9SIfML.A.TU1fS <br /> 2.5 SITE HEALTH AND SAFETY <br /> ' <br /> LSee Appendix A for WESTONs site specific health and safety plan.�E E <br /> 3.0 QUALITY ASSURANCE PLAN <br /> 'r <br /> 1 3.1 DECONTAMINATION PROCEDURES <br /> All sampling equipment, including stainless steel liners, I�split spoons, and bailers, will be <br /> �•.r decontaminated prior to use with a trisodium phosphate solution followed by a distilled water <br /> rinse. The drill rig and push rods will be steam cleaned prior to sampling. <br /> L ` <br /> 3.2 WASTE HANDLING <br /> i, <br /> Soil waste will not be generated during the investigation. Decontamination fluids will be stored <br /> g g , <br /> at the site pending receipt of the analytical results. <br /> f 3.3 SAMPLE LABELING AND HANDLING <br /> 3.3.1 Sample Containers <br /> 1i <br /> Groundwater samples for BTEX and TPH-G analysis will be collected in three 40 ml glass vials <br /> with septa and preserved with hydrochloric acid. Soil samples for BTEX and TPH-G analysis <br /> will be collected in stainless steel tubes. <br /> 3.3.2 Sample Identification and Labeling <br /> i <br /> + Groundwater samples will be identified by the sample location followed by the sample depth and <br /> GW to indicate the g sample is groundwater. For exam p <br /> le sample SB-2-45GW was a <br /> p Ip <br /> groundwater sample collected at location SB-2 at 45 feet bj Soil samples will be identified <br /> by sample location and depth. Sample labels will contain the sample identification, time and <br /> date of collection, analytical method to be performed, and preservative. <br /> I UPROJECTSTEPBOYSNP 4 Ja ry IW7 <br /> ]1r <br /> � II, <br />